zero
HOME AUTOMATION
Z01 - SLIDING GATE
PG5
03. INSTALLATION
INSTALLATION DIMENSIONS
During installation you will need to open the motor cover, to access various components on the
inside. For this, loosen the screw until the cover is free to be removed.
For correct operation of the automatism, it is necessary to pay attention to the dimensions given
in the following images.
On the Illustrated pictures below are the dimensions for the installation of the automated sy
-
stem.
INSTALLATION STEPS
Q P
60
01. Position the operator 50 mm from the
edge of the gate and perfectly square at an
angle of 90° and mark the place to make
the holes for the bushings. Must make the
mark at the center of the oval holes
02. Drill four holes with Ø18mm on foun-
dation. Place M10 steel anchors on the ho
-
les. Align it parallel to the gate leaving a di-
stance of 50 mm and anchor the operator.
03. Mesh the rack with the pinion, leaving 1
to 2 mm backlash between the teeth. This
backlash must remain constant over the
entire length of the rack. Fix / weld the rack
to the gate.
03. Bring the gate to its open position ma
-
nually, stopping at a distance of 3cm from
the mechanical limit stop. Slide the limit
stop bracket along the rack until causing
the limit stop to trip. Fix the bracket to the
rack with the dedicated screws.Perform
the same operation for the closing limit
stop.