
Charging System
DC/DC Converter
25-21
25
8. Squeeze tabs to release OBDII connector from
tank storage liner.
9. Disconnect USB power hub harness
connector.
10. Remove bolts (x2) securing storage liner to
storage liner plate. Tool: T27. Torque: 2.5 lb-ft
(3 Nm).
Note: During installation, do not snug storage
liner bolts until tank is installed.
11. Remove storage liner.
12. Disconnect DC/DC converter harness
connector.
13. Remove bolts (x4) securing DC/DC converter
to the HCU bracket. Tool: T30. Torque: Hand
14. Remove DC/DC converter.
Installation
1. Installation is the reverse of the removal
procedure.
Содержание SR/S
Страница 2: ......
Страница 10: ...2 4 General Information ...
Страница 68: ......
Страница 90: ......
Страница 177: ...Suspension Rear Suspension 40 41 40 12 Recheck the belt adjustment after the test ride and readjust if necessary ...
Страница 178: ......
Страница 210: ......
Страница 243: ...Body Body 60 33 60 9 Remove right grab handle Installation 1 Installation is the reverse of the removal procedure ...
Страница 273: ...Electrical Mode Switch 70 25 70 Installation 1 Installation is the reverse of the removal procedure ...
Страница 289: ...Electrical Main Bike Board MBB 70 41 70 ...
Страница 290: ......