
20-18
Power Pack
Power Pack
20
16. Cut cable tie securing the self amalgamating
tape (PN: 81-08088) and bead type thermistor
to the contactor fuse.
Note: Replace cable tie during the installation
process.
17. Remove self amalgamating tape (PN:
81-08088) securing bead type thermistor to
the contactor fuse.
Note: Replace self amalgamating tape during
the installation process.
18. Release bead type thermistor.
19. Release orange sheathed harnesses (x2) from
between the B+ buss and upper right heat sink
skin.
20. Cut cable ties (x2) securing Battery Signal B-
Sense Line to Battery Signal B+ Sense Line
harness.
Note: Replace cable tie during the installation
process.
21. Disconnect battery signal B+ Sense Line grey
harness connector.
22. Remove bolt securing HV cable retainer. Tool:
T25. Torque: 28 in-lb (3.16 Nm).
Содержание SR/S
Страница 2: ......
Страница 10: ...2 4 General Information ...
Страница 68: ......
Страница 90: ......
Страница 177: ...Suspension Rear Suspension 40 41 40 12 Recheck the belt adjustment after the test ride and readjust if necessary ...
Страница 178: ......
Страница 210: ......
Страница 243: ...Body Body 60 33 60 9 Remove right grab handle Installation 1 Installation is the reverse of the removal procedure ...
Страница 273: ...Electrical Mode Switch 70 25 70 Installation 1 Installation is the reverse of the removal procedure ...
Страница 289: ...Electrical Main Bike Board MBB 70 41 70 ...
Страница 290: ......