4 • Installation & Operation
INSTALLATION & OpERATION
!
CAUTION!
DO nOT STAnD On TOP OF A CRYSTAL MERCHAnDISER
®
. THE TOP OF THE CASE IS nOT DESIGnED TO
SuPPORT THE WEIGHT OF A PERSOn.
Delivery Inspection
Zero Zone display cases are carefully factory-tested, inspected, and packed to ensure delivery in the best possible condition. The equipment
should be unwrapped and checked for damage immediately upon delivery. DAMAGE MUST BE NOTED AT TIME OF DELIVERY, AND ALL
CLAIMS FOR DAMAGES MUST BE FILED WITH THE TRANSPORTATION COMPANY, NOT WITH ZERO ZONE. The carrier will supply
necessary report and claim forms. Contact your Zero Zone sales representative or the service department to arrange for replacement parts.
Do not leave, store, or hold case outdoors in direct sunlight or high ambient temperature. With the end panels on, the case is airtight;
the inside temperature of the case will increase, and the heat will be unable to escape. This could potentially cause any plastic inside
the case to deform or warp.
Packaging
Each case in a lineup is labeled to identify the lineup and joint
. The label uses a 2-digit number designation, separated by a decimal. The first
number indicates the case lineup. The second number indicates the case joint. Case joints begin with the number “1” at the left most joint in the
lineup when looking at the front of the lineup. The first case in the lineup will be labeled on the right end and the second case in the lineup will
be labeled on the left end. The numbers on each end to be joined will match, as indicated (
). Back-to-Back cases have a side “A”
and a side “B”.
The
first
case in a lineup (with the right side labeled “x.1”) has a packet attached to the shelving that contains touch-up paint.
Every
case in
a lineup has a packet attached to the shelving that contains important information about the case and/or lineup and, if applicable, special
instructions for installing ordered options.
Bumpers and kickplates are shipped on top of the case. Shelves for the case are tie-wrapped and blocked into the individual cases. Other
accessories like drain traps, drain pans, condensate evaporation pans, and hat channel rails are shipped in the case that require the parts.
Materials for joining cases—including caulk, joining bolts, splices, and end filler posts—are shipped in each case to be joined.
The door is prevented from opening during shipment with the use of a door-holding shipping bracket. The bracket is screwed to the top of the
case at each door and should be removed when the case is unpacked.
Location
These cases must not be installed in the direct rays of the sun or near a source of radiant heat. Be certain that the floor under the installation is
of sufficient strength to prevent sagging. Uneven surfaces will result in reduced performance.
Building soffits must be set back at least 6" from the front of the case to allow access to electrical wiring on the top of the case.
INSTALLATION & OpERATION
Front of Back-to-Back Lineup
1.1B 1.1B
1.2B 1.2B
1.1A 1.1A
1.2A 1.2A
Front of Lineup
1.1 1.1
1.2 1.2
FIGURE 1: Case Label Information