4-24
M2
8.
Have a second assistant take a
measurement using the same locations as
in step 2.
9. Record this measurement; this will be
measurement M2.
10. Subtract the second measurement (M2)
from the first measurement (M1).
Example:
The total sag is 100 mm (4.0 in). Refer to the chart
below for the correct sag. If the sag is not correct, the
spring pre-load should be adjusted. See Spring
Pre-load Adjustment.
M1
600 mm
(24 in)
M2
-
500 mm
(28 in)
Sag
=
100 mm
(4 in)
MODEL
SAG
X - Street Legal
74 mm (2.91 in)
MX - Dirt
74 mm (2.91 in)
XU - Street Legal
46 mm (1.81 in)
Содержание XU 2012
Страница 1: ...ZERO X ZERO MX ZERO XU 2012 Owner s Manual ...
Страница 5: ...TOC 4 NOTES ...
Страница 27: ...2 6 NOTES ...
Страница 44: ...3 17 A B C A Motor Stop Switch B Front Brake Lever C Throttle Control Handlebar Controls MX Dirt ...
Страница 49: ...3 22 NOTES ...
Страница 78: ...5 3 ZERO A C D E F B See Bolt Torque Table on page 5 2 ...
Страница 79: ...5 4 G H J I K See Bolt Torque Table on page 5 2 ...
Страница 109: ...5 34 NOTES ...
Страница 127: ...6 18 NOTES ...
Страница 135: ...7 8 NOTES ...
Страница 142: ...TAKE CHARGE www zeromotorcycles com ...