Concrete Anchoring (materials not included)
If the swing set is set up on grounds with sandy soil (soft) condition, it must be anchored with concrete
footings (concrete not included).
Be sure that the swing set is assembled and placed on level ground.
Dig holes around swing leg tube as pictured. As you dig deeper, enlarge the diameter of the hole to fix the
cement.
Place 7cm of brick or gravel underneath the leg as pictured.
Use about 45lbs (20kg). of concrete per leg
Cover the concrete with dirt and protective surface material
Allow 6-7 days for the concrete to dry properly before using the swing.
If you are unsure about how to properly anchor your swing using this method, we strongly advise that you
appoint a qualified local contractor to carry out the work.
You must maintain a minimum of 35cm of ground clearance.
The height of the fully assembled product is 180cm. The minimum ground clearance between the bottom of the
suspended swing and the ground surface must be 35cm.
FRAME LEG
CONCRETE
BRICK OR GRAVEL BED
7cm
32cm
12cm
35cm