Doc Number 801-00015, Version 1.1, Copyright © 2010 Zep Solar, Inc.
PAGE:
17 of 28
ZEP SYSTEM II INSTALLATION MANUAL
5.7 > Leveling Foot Installation
1. With two installers, one above and one below the Module pair, load a Leveling Foot into the Zep
Tool (Figure 5.7A). Use the array perimeter marking and the rafter chalk line to identify where to
place the Module and Leveling Foot according to the system design. Both installers should then
simultaneously insert their Leveling Foot into the bottom and top of the Module groove, key first
(See Figure 3.0B), at the 3 o’clock position (Figure 5.7B).
NOTE:
There is no need to measure exactly where to insert the Foot Zep: just “eyeball”
the location approximately above the rafter or attachment device. If you are off by a small
margin, you can swing the base of the Foot to align it with the rafter location.
Figure 5.7A
Figure 5.7C
Figure 5.7B
Figure 5.7D