
Fixed Hoist Test Facility Operation and Maintenance Manual
ZOM-12000-7 rev 0
Page 18 of 24
This manual contains proprietary information and is not to be copied or disclosed without written
permission from Zephyr International LLC. Copyright 2006-2008
Attach the plug from the Ground Power Cart to the receptacle provided.
o
Attach the 220 V AC power
o
Attach the ZGS-12201-1, ZGS-12202-1 and the ZGS-12203-1 cable
assemblies,
ZGS-12201-1 High Speed Hoist Test Stand Main Cable
3 phase breaker switch
220 VAC 50 Hz input power