Zephyr ZGS-12000-7 Скачать руководство пользователя страница 15

Fixed Hoist Test Facility Operation and Maintenance Manual 

ZOM-12000-7 rev 0 

 

Page 15 of 24 

 This manual contains proprietary information and is not to be copied or disclosed without written 
permission from Zephyr International LLC.   Copyright 2006-2008 

 
Locate the FHTF in its final position and bolt the base to the floor if desired with the 
floor attachment angles provided. 

Содержание ZGS-12000-7

Страница 1: ...ns proprietary information and is not to be copied or disclosed without written permission from Zephyr International LLC Copyright 2006 2008 ZGS 12000 7 Fixed Hoist Test Facility FHTF Used in conjunct...

Страница 2: ...closed without written permission from Zephyr International LLC Copyright 2006 2008 Table of Contents Fixed Hoist Test Facility FHTF 3 System Floor Plan 5 System Interconnect Diagram 6 Assembly of FHT...

Страница 3: ...with a chain hoist to raise the UUT up to the top of the structure where it is attached to two load cells The two load cells provide signals to a load cell summing box where the signals are summed an...

Страница 4: ...the system performance set the hoist s limit switches adjust the levelwind and replace and condition the wire rope before the UUT is mounted onto the aircraft thus minimizing aircraft down time and fl...

Страница 5: ...al ZOM 12000 7 rev 0 Page 5 of 24 This manual contains proprietary information and is not to be copied or disclosed without written permission from Zephyr International LLC Copyright 2006 2008 System...

Страница 6: ...d Maintenance Manual ZOM 12000 7 rev 0 Page 6 of 24 This manual contains proprietary information and is not to be copied or disclosed without written permission from Zephyr International LLC Copyright...

Страница 7: ...itten permission from Zephyr International LLC Copyright 2006 2008 Assembly of FHTF o Unpack the crates and verify all the parts arrived in good condition o Use a forklift and lift the base weldment o...

Страница 8: ...rietary information and is not to be copied or disclosed without written permission from Zephyr International LLC Copyright 2006 2008 o Locate the upper brace mount and attach it to the I beam with it...

Страница 9: ...prietary information and is not to be copied or disclosed without written permission from Zephyr International LLC Copyright 2006 2008 o Flip the I beam over and attach the Hoist Hanging Weldment to i...

Страница 10: ...nual contains proprietary information and is not to be copied or disclosed without written permission from Zephyr International LLC Copyright 2006 2008 o With two people or a crane stand up the I beam...

Страница 11: ...ational LLC Copyright 2006 2008 o Place the lower brace corner mount into position and loosely attach the brackets with one bolt in each corner Identify the left and right diagonal braces and mount th...

Страница 12: ...chain hoist support to the top of the hoist hanging weldment o Then attach the chain hoist with the chain cover facing outwards o Tighten the nuts on the u bolts securely to prevent the chain hoist fr...

Страница 13: ...in hoist and lower the hook to allow the hanging hoist mount to be attached o Using the chain hoist control lift the hanging hoist mount up so it can be attached to the slider assembly with its two pi...

Страница 14: ...from Zephyr International LLC Copyright 2006 2008 Controls Frame 3 Phase input power receptacle Load Cell Readout and 28 VDC power Box o Mount the controls frame and the 3 phase input power receptacle...

Страница 15: ...f 24 This manual contains proprietary information and is not to be copied or disclosed without written permission from Zephyr International LLC Copyright 2006 2008 Locate the FHTF in its final positio...

Страница 16: ...ip switch setting is 12345678 COCOOCOO Set Rd CF R 2 1 If a 600 lbs load is available Scale the meter according to section 4 3 1 With the UUT mounted on the hanging hoist mount with no load on it and...

Страница 17: ...just enough to allow removing the pins from the lower load cell clevis o Remove the pins and then lower the hanging mount to the lower position as shown o Install the UUT onto the post mount and insta...

Страница 18: ...r disclosed without written permission from Zephyr International LLC Copyright 2006 2008 Attach the plug from the Ground Power Cart to the receptacle provided o Attach the 220 V AC power o Attach the...

Страница 19: ...12000 7 rev 0 Page 19 of 24 This manual contains proprietary information and is not to be copied or disclosed without written permission from Zephyr International LLC Copyright 2006 2008 ZGS 12203 1...

Страница 20: ...ted should go to zero System Operating Procedure The system is design to be operated in conjunction with the Mobile RHGSE as shown on the cover of the manual ZOM 10000 5 describes the operation and ma...

Страница 21: ...nstall hoist a Install electrical connectors and tighten b Insert 2 inch bolts or pins through one side 3 Raise hanging hoist mount a Install two load bolts b Lower chain hoist to apply load to load c...

Страница 22: ...rope and hook from mobile GSE 2 Raise and stow hook against hoist bell mouth 3 Turn Indicator Switch off 4 Push Circuit Breaker Switch off 5 Remove mobile GSE from under the rescue hoist 6 Detach con...

Страница 23: ...ion and Maintenance Manual ZOM 12000 7 rev 0 Page 23 of 24 This manual contains proprietary information and is not to be copied or disclosed without written permission from Zephyr International LLC Co...

Страница 24: ...M 12000 7 rev 0 Page 24 of 24 This manual contains proprietary information and is not to be copied or disclosed without written permission from Zephyr International LLC Copyright 2006 2008 Assembly Dr...

Отзывы: