17
Verona Use, Care, and Installation Guide
ZEPHYRONLINE.COM
Installation Instructions
Mounting the Hood
1. Measure from range top to hood bottom and
mark line A. (24” minimum from range top) .
2. Plum and mark center line.
3. Mark mounting height line B. (14-3/4” from line
A)
4. Mark mounting spread from C/L. (11-1/8”)
5. Fasten (2) #6 x 1-1/2” screws into studs on line B
but do not tighten all the way.
NOTE:
Wood blocking may need to be added
behind the drywall if no studs are present. Wall
anchors may also be used but check local
codes for compliance. Failure to use suitable
wall anchors and screws to hold the weight
of the hood could result in personal injury or
damage to cooking surface or counter.
6. Remove tape and (2) screws securing
electronics mounting bracket to hood.
Reposition electronics mounting bracket as
shown in FIG. A3 and secure to motor housing
using the (2) previously removed screws.
Duct Cover
Bracket
Brackets are
pre-installed
1
2
B
A
C/L
C/L
11-1/8”
24” min.
14-3/4”
FIG. B
At least two installers are required due to the
weight and size of the hood.
CAUTION
Содержание Verona ZVO-E30BG
Страница 2: ...2 Verona Use Care and Installation Guide VERONA WALL CORE...
Страница 33: ...33 Verona Use Care and Installation Guide ZEPHYRONLINE COM Notes...
Страница 34: ...34 Verona Use Care and Installation Guide VERONA WALL CORE Notes...
Страница 38: ...2 Verona Guide d utilisation d entretien et d installation VERONA MUR CORE...
Страница 69: ...33 Verona Guide d utilisation d entretien et d installation ZEPHYRONLINE COM Remarques...
Страница 70: ...34 Verona Guide d utilisation d entretien et d installation VERONA MUR CORE Remarques...