17
Typhoon, Hurricane, & Cyclone Use, Care, and Installation Guide
ZEPHYRONLINE.COM
Installation Instructions
Rectangular Horizontal Ducting Preparation
Ź
By default the Typhoon and Hurricane are pre-configured for 7” round vertical ducting.
Ź
By default the Cyclone is pre-configured for 6” round vertical ducting.
1. Using a Philips-head screwdriver
remove the screws and round vertical
transition adapter from the top of the
hood.
3. Typhoon ONLY. Remove the two
plastic air diverter blocks. The blocks
are located in the hood and can be
accessed from the top when the round
transition adapter is removed.
2. Using a Philips-head screwdriver,
remove the screws and 3-1/4"x10"
rectangular cover plate from back of
hood.