Attach screws to
ceiling bracket
C/L
Duct Cover
Ceiling Bracket
www.zephyronline.com
1. Measure from cooking surface to hood bottom, level and mark line A.
2. Plum and mark center line.
3. Mark mounting height line B (20” from line A). This is the top of the hood.
4. Measure up, 16 1/4” from line A and mark mounting spread from C/L. Line C (24”).
5. Follow center line up to the ceiling, measure and mark 5 3/4” away from the wall. Make sure the spot
you mark is still on the center line. This is where the duct cover celing bracket will mount.
6. Place duct cover ceiling bracket onto ceiling and mark the (2) holes where screws will be attached.
If attaching bracket to drywall only, drill and insert the provided anchors into the marked holes. Cut out
inside diameter of the ceiling bracket to fit the 6” or 8”round duct work through. Attach bracket to ceiling
with (2) screws provided.
7. Prepare duct work and electrical.
All Electrical work must be performed by a qualified electrician or person with similiar
technical know and background.
For personal safety, remore house fuse or open circuit beaker before beginning installation.
Do not use extension cords or adapter plug with this appliance.
Follow National Electrical Codes or prevailing local codes and ordinances.
Electrical Supply:
This appliance requires a 120V 60Hz electrical supply, and connected to an individual, properly grounded branch
circuit, protected by a 15 or 20 ampere cicuit breaker or time delay fuse. Wiring must be 2 wire with ground.
Please refer to Electrical Diagram labeled on product.
G
NI
N
R
A
W
-
L
A
CI
R
T
C
E
L
E
-
n
oi
t
all
at
s
nI
d
o
o
H
g
ni
r
a
p
er
P
12
Duct Cover
Ceiling Bracket
C/L
min 24”
max 32”
20”
B
A
16 1/4”
24”
C
Содержание Shade CSH -E42SX
Страница 2: ...www zephyronline com...