13
Cypress Use, Care, and Installation Guide
ZEPHYRONLINE.COM
Installation Instructions
Mounting the Hood
1. Select preferred ducting application (vertical or
horizontal) and prepare hood. Refer to page 14
for horizontal ducting conversion.
2. Plum and mark center line on wall.
3. Choose desired height above cooking surface
(30” min). Level and mark hood bottom, line A
(FIG. B).
4. Level and mark top of wood board, line B (FIG.
B) 16 7/8” from line A.
5. Mark center line of wood board. Center and
align top of board with line B. Secure wood
board to studs using (4) M6 wood screws.
Wood Board Dimensions: (W x D x H)
AK7836CS - 33” x 1/2” x 4”
AK7842CS - 39” x 1/2” x 4”
AK7848CS - 45” x 1/2” x 4”
AK7854CS - 51” x 1/2” x 4”
6. Prepare duct pipe and duct cut outs in upper
cabinet if needed or wall if horizontally ducting
hood. Prepare electrical wiring and electrical
cut outs in upper cabinet if needed or wall
if horizontal electrical hook up is required.
Refer to hood specifications on page 11 for
dimensions.
7. Mount hood onto wood board and secure using
(4) M6 wood screws.
8. Further secure hood onto wall through lower
FIG. B
C/L
C/L
A
B
16-
7/8
”
min
30”
4”
wood board
16-7/8”
16-1/8”
13-5/8”
1-11/16”
3-5/16”
21-1/4”
35-1/4” (42”, 48”, 54”)
5-5/16”
body screw holes by (2) M6 wood screws. See dimensions in FIG. C.
9. Install electrical. Install duct work and seal with certified aluminum duct tape.
10. Power up hood and check for leaks around duct tape.
11. Install pro baffle filters.
FIG. C
C/L
C/L
A
B
16-
7/8
”
min
30”
4”
wood board
16-7/8”
16-1/8”
13-5/8”
1-11/16”
3-5/16”
21-1/4”
35-1/4” (42”, 48”, 54”)
5-5/16”