Fixed Hoist Test Facility Operation and Maintenance Manual ZOM-12000-9 rev 0
Zephyr International LLC *5015 Enoch Rd, Conway SC 29526 * Phone 843-365-2675 *Fax 843-365-2677
Web
www.zephyrintl.com
*
Serving Helicopter Rescue Hoist Users Worldwide
Copyright 2010
Operating Procedure
BL-29900
Shut Down
1. Disconnect the rescue hoist cable from the Zephyr RHGSE
2. Retract the cable to full in and insure the full up limit switch activates and the bumper
compresses properly
3. Turn of the Power switch on the control box
4. Press the 400 hz power switch to off
5. Detach the electrical harness connectors
6. Raise the rescue hoist mount with the chain hoist and remove pins
7. Lower hoist to lowest position
8. Remove the hoist and arm from the hoist mount