background image

                          Fixed Hoist Test Facility Operation and Maintenance Manual        ZOM-12000-9 rev 0 

 

Zephyr International LLC  *5015 Enoch Rd, Conway SC 29526  * Phone 843-365-2675 *Fax 843-365-2677 

Email  

[email protected]*

 Web 

www.zephyrintl.com

  * 

Serving Helicopter Rescue Hoist Users Worldwide 

  Copyright 2010 

 

 

Operating Procedure     

BL-29900

 

 

 

Shut Down 

 

1.  Disconnect the rescue hoist cable from the Zephyr RHGSE 

2.  Retract the cable to full in and insure the full up limit switch activates and the bumper 

compresses properly 

3.  Turn of the Power switch on the control box 

4.  Press the 400 hz power switch to off 

5.  Detach the electrical harness connectors 

6.  Raise the rescue hoist mount  with the chain hoist and remove pins 

7.  Lower hoist to lowest position 

8.  Remove the hoist and arm from the hoist mount 

 

 

Отзывы: