background image

- 17 -

FIG.14

INTERNAL BLOWER WIRING

Note: This range hood must be properly grounded. The unit should be installed by a
qualified electrician in accordance with all applicable national and local electrical codes.

1. Make connections (A, B,C) (Fig.14).
2. Secure capacitor box screwing the (2) 3.9x9.5 mm screws (Fig.14D).
3. Remove the wiring box cover. Remove a knockout from the wiring box (Fig.14A).
4. Secure the conduit to the wiring box through a conduit connector.
5. Make electrical connections. Connect white to white, black to black and green to ground.
6. Replace wiring box cover and screws. Make sure that wires are not pinched between cover

and box.

WIRING BOX

COVER

A

D

B

C

GROUND

CONNECT:
WHITE-TO-WHITE,
BLACK-TO-BLACK,
GREEN-TO-GROUND.

Содержание ALA-M90BBX

Страница 1: ...www zephyronline com Duo Wall ADU M90BSX Layers Wall ALA M90BBX ALA M90BWX ALA E42BBX ALA E42BWX RANGE HOOD Installation and use instructions ENGLISH 2 FRANÇAIS 30 ...

Страница 2: ...rk sections Fig 7 FIG 7 ROOF CAP DUCT COVER HOOD 24 MINIMUM ABOVE COOKING SURFACE WALL CAP 6 ROUND DUCT INSTALLING THE INTERNAL BLOWER NOTE The following instructions are for installing the internal blower only Installthisrangehoodonlywithinternalblower model CBI 290A or CBI 600A 1 Remove the electrical system box from chimney frame by removing duct tape 2 Remove the 6 metallic flange provided on ...

Страница 3: ...WS 3 9 x 6 mm Flat Head hardware bag Fig 10 5 Remove the blower plate unscrewing the 4 3 9x9 5 mm screws Fig 11 6 Install internal blower into blower plate and secure using 4 screws supplied with the internal blower See Fig 12 7 Install blower using 4 3 9 x 6mm mounting screws Fig 13 ...

Страница 4: ... box screwing the 2 3 9x9 5 mm screws Fig 14D 3 Remove the wiring box cover Remove a knockout from the wiring box Fig 14A 4 Secure the conduit to the wiring box through a conduit connector 5 Make electrical connections Connect white to white black to black and green to ground 6 Replace wiring box cover and screws Make sure that wires are not pinched between cover and box WIRING BOX COVER A D B C G...

Страница 5: ... Install the front plate and electrical system box using 4 3 9x6 mm screws Fig 15 FIG 15 FIG 16 9 Place the 6 metallic flange provided on the blower s air outlet Fig 16 4 MOUNTING SCREWS 3 9 x 6 mm Flat Head ...

Страница 6: ...for mounting location suggestions and restrictions 2 A straight short duct run using a minimum 8 round duct will allow the hood to perform most efficiently 3 Long duct runs elbows and transitions will reduce the performance of the hood Use as few of them as possible Larger ducting may be required for best performance with long duct runs 4 After the External or In Line Blower has been installed con...

Страница 7: ...unt electrical system box by means 2 3 9x9 5 mm screws re fix the side screw 3 Remove the blower plate unscrewing the 4 3 9x6 mm screws Fig 18 4 Remove 2 screws Fig 19A position the external blower plate and remote blower box over blower housing and fix using 4 3 9x6 mm screws Fig 19B 5 Install 8 round blower collar to top of blower housing screwing the 4 3 9x6 mm screws Fig 20 FIG 18 FIG 19 FIG 2...

Страница 8: ...ect white to white black to black green to ground Fig 21A 6 Make electrical connections remote blower box marked motor connection Connect white to white black to black blue to blue red to red green to ground Fig 21B 7 Mount the wiring box covers and screws Make sure wires are not pinched between the cover and box External blower connection 1 Make electrical connections at the remote blower see ins...

Страница 9: ...sions shown in Fig 22 23 3 Hang the hood onto the screws 4 Tighten mounting screws Add additional screws through hood body as needed for additional support Notes a Minimum hood distance above cook top must not be less than 24 A maximum of 36 above cook top is highly recommended for best capture of cooking impurities Distances over 36 are at the installer and the users discretion and if ceiling hei...

Страница 10: ... adjusting outside width as shown Fig 24 2 Carefully center the mounting bracket directly over the range hood location 3 Secure the bracket assembly to the ceiling using 2 4 8 x 38mm mounting screws and drywall anchors Fig 25 Make sure the bracket is pushed into the corner tight against the wall if necessary and centered over the hood DRYWALL ANCHORS FIG 24 FIG 25 113 4 ...

Страница 11: ... 1 Run 6 inch diameter metal ductwork to the outside location Fig 26 2 Install an appropriate wall or roof cap with damper to exhaust the air to the outside 3 Tape all duct joints with aluminum duct tape 4 Install upper and lower duct covers onto the range hood Fig 27 5 Secure upper duct cover to duct cover mounting bracket with 2 3 9 x 9 5 mm screws Fig 28 FIG 26 FIG 27 FIG 28 CEILING CONCEALED V...

Страница 12: ... from your local dealer Discard the upper duct cover supplied with the range hood and replace it with the longer duct cover extension 1 Install the plenum to the upper duct cover using 4 3 9 x 6 mm screws provided as shown Fig 29 2 Install the 6 duct connector 3 Attach 6 inch expandable ducting to the plenum and tape joint with aluminum duct tape Fig 30 4 MOUNTING SCREWS 3 9 x 6mm Flat Head DUCT C...

Страница 13: ... shown Fig 31 5 Lift the duct covers into position above the hood Secure upper duct cover to the duct covers mounting bracket with 2 3 9 x 9 5 mm screws Fig 32 6 Remove tape from duct covers and lower into position on the hood Fig 33 FIG 33 FIG 31 FIG 32 2 MOUNTING SCREWS 3 9 x 9 5mm ...

Страница 14: ... filter into place and release tab Make sure the filter is securely engaged after installation NON DUCTED HOODS ONLY 1 To remove the CHARCOAL filter grip and push filter tab toward rear of hood Pull the filter down to disengage the rear filter tabs Fig 35 2 To install the CHARCOAL filter align filter in rectangular opening Push filter against springs in rear of hood and press into place Make sure ...

Отзывы: