background image

11

This range hood is equipped standard with a 6” round vertical duct option.  To convert from 6” round vertical to 

3-1/4” x 10” horizontal ducting please following the instructions below.

NOTE: Horizontal ducting is only available for the single internal blower.

VERTICAL TO HORIZONTAL DUCTING CONVERSION

1.  Disconnect blower wire.

2.  Remove support screw from top of hood near 

the back. Remove 2 screws holding blower plate 

to hood and pull blower towards front of hood to   

release from internal bracket.

3.  Unscrew (4) screws holding blower to blower 

plate and remove blower.

4.  Cover round blower opening on blower plate 

with 6” round metal cap.  Attach with (3) 3.5x8 

screws.

5.  Re-attach blower plate to hood by following 

removal instructions in reverse.

Installation – 

Horizontal Conversion

Содержание AK7000AS

Страница 1: ...are and Installation Guide www zephyronline com Model number Serial Number Date of Purchase Sales Dealer SEP07 0101 Zephyr Corporation Tempest I AK7000AS AK7036AS AK7042AS READ AND SAVE THESE INSTRUCT...

Страница 2: ...www zephyronline com...

Страница 3: ...ptions 7 Speci cations 8 Mounting the Range Hood 9 10 Horizontal Conversion 11 12 PBD 1100A Dual Blower 13 14 ACCESSORY INSTALLATION Heat Lamp Kit 15 FEATURES CONTROLS Touch Controls Features 16 MAINT...

Страница 4: ...PERSONS IN THE EVENT OF A RANGE TOP FIRE OBSERVE THE FOLLOWING a SMOTHER FLAMES with a close tting lid cookie sheet or metal tray then turn off the burner BE CAREFUL TO PREVENT BURNS If the ames do n...

Страница 5: ...assure that the electrical installation is adequate and in conformance with National Electrical Code ANSI NFPA 70 latest edition or CSA standards C22 1 94 Canadian Electrical Code Part 1 and C22 2 No...

Страница 6: ...rectangular transition for single blower horizontal ducting 1 6 round metal cap for single blower horizontal ducting 2 Blower brackets for single blower horizontal ducting 1 Hardware package HARDWARE...

Страница 7: ...Ft 6 Round straight 1 Ft x Ft Subtotal column 1 Duct pieces T otal Equivalent number length x used 6 Round wall cap with damper 30 Ft x Ft Round wall cap with damper 30 Ft x Ft 7 10 Round 900 elbow 15...

Страница 8: ...re required install as far away from hood duct output and as far apart between the two as possible Minimum mount height between range top to hood bottom should be no less than 26 Maximum mount height...

Страница 9: ...ust must be ducted to the outside Use metal ductwork only Fasten all connections with sheet metal screws and tape all joints with certi ed Silver Tape or Duct Tape Some Ducting Options Installation Du...

Страница 10: ...7 8 30 33 7 8 36 39 13 16 42 29 15 16 30 35 15 16 36 41 15 16 42 9 15 16 1 1 8 8 9 16 13 3 16 6 7 16 3 2 12 11 3 22 1 2 29 15 16 30 35 15 16 36 41 15 16 42 CL 5 7 8 5 9 16 elec k o top side back with...

Страница 11: ...al codes and ordinances Electrical Supply This appliance requires a 120V 60Hz electrical supply and connected to an individual properly grounded branch circuit protected by a 15 or 20 ampere circuit b...

Страница 12: ...ut the required openings for duct and electrical access make sure the duct opening is large enough to apply duct tape 6 Fasten hood onto cabinet with 4 M4 wood screws provided 7 Install electrical 8 I...

Страница 13: ...G CONVERSION 1 Disconnect blower wire 2 Remove support screw from top of hood near the back Remove 2 screws holding blower plate to hood and pull blower towards front of hood to release from internal...

Страница 14: ...ide 8 Picture of round to rectangular transition adapter installed in hood 9 Attach blower brackets to blower using 2 10x3 16 screws on each bracket 10 Place blower inside round end of round to rectan...

Страница 15: ...Discard single blower plate 4 Picture of PBD 1100A dual blower kit 5 Use the blower removed from the single blower plate and install it into the dual blower plate DUAL BLOWER INSTALLATION IMPORTANT D...

Страница 16: ...blower is also fitted with a metal damper If using the PBD 1100A dual blower kit the metal damper from the 6 round single blower must be removed prior to instaling the 10 round adapter See installati...

Страница 17: ...ided 4 Install heat lamp wire cover over wire from heat lamp housing and screw shut Repeat for each heat lamp housing 5 Plug heat lamp wire from hood into wire from heat lamp housing 6 Install heat la...

Страница 18: ...right hand side of display indicating the function is on The hood will change to speed 1 and shut down after 5 minutes Lights On Dim Off Manual On Off Switch lights On by pressing once again to dim an...

Страница 19: ...ith grain Stainless Steel Baffle Filters The stainless steel baf e lters are intended to trap residue and grease from cooking Although the lters should never need replacing they are required to be cle...

Страница 20: ...by turning bulb counter clockwise Note Bulb does not unscrew it turns 60 degrees stops and falls out If bulbs are dif cult to turn due to prolonged use rmly attach a glass suction cup approximately t...

Страница 21: ...ot secure in place 1 Tighten the motor in place 2 Damaged blower wheel 2 Change the blower 3 The hood is not secured in place 3 Check the installation of the hood The motor is working but the lights a...

Страница 22: ...0700AS Heat Lamp Kit 36 AK0706AS Heat Lamp Kit 42 AK0702AS Back Splash 30 AK0710 Back Splash 36 AK0716 Back Splash 42 AK0712 To order parts visit us online at http store zephyronline com or call us at...

Страница 23: ...isuse abuse accident Improper installation and failure to follow installation instructions When product is used commercially or other than its intended purpose Damaged because of improper connection w...

Отзывы: