Pg 13 of 28
1-800-892-3986 IS02157-I3
fig. 2
tub ledge installation
fig. 2
shower stall floor installation
STEP 8
8-1.
Place the tape strips (H) around the seams of the tubes.
8-2.
Place the top of the unit against the ceiling in the desired location
(fig.1)
and then compress
the unit
UP
and move the bottom end into place
(fig.2)
so that the unit is in a vertical
position.
NOTE: Make sure the assembly is in place, secure and vertical.
If needed,
refer to STEP 7
to ensure that the assembly
measures 2 inches longer
than your
tub or shower stall opening height
AND
that the Twist tube (B) is tight.
This ensures the proper tension!
NOTE: Make sure you are installing in a clean, dry and safe environment.
fig.1