
COOLING SYSTEM
EM -59
INSPECTION
E6CC2E0F
Check the coolant pipe and hoses for cracks, damage, or
restrictions.
Replace if necessary.
REASSEMBLY
E1DCE4A4
Fit on O-Ring in the groove provided at the coolant inlet
pipe end, wet the O-ring with coolant and insert the coolant
inlet pipe.
NOTE
1.
Do not apply oil or grease to the coolant pipe
O-ring.
2.
Keep the coolant pipe connections free of sand,
dust, etc.
3.
Insert the coolant pipe fully into the cylinder
block.
4.
Do not reuse the O-ring. Replace it with a new
part.
Cylinder block
Coolant inlet pipe
Coolant pump assembly
ECKA040A
ZENITH POWER PRODUCTS - 416
Содержание ZPP 416
Страница 1: ......
Страница 63: ...THIS PAGE INTENTIONALLY LEFT BLANK ZENITH POWER PRODUCTS 416 ...
Страница 76: ...THIS PAGE INTENTIONALLY LEFT BLANK ZENITH POWER PRODUCTS 416 ...