Page 24 of 28
802149NZ - BHA; CHA; CSHA -Installation Instructions - Aug 2015 - V2.00
The Celsius is now ready to be commissioned.
•
Turn ON the water and check for any leaks.
•
Turn the power ON at the GPO and at the side of the undersink unit.
•
Familiarise yourself with the operation of the Tap, in preparation for use (See User Guide).
•
Select the language option from the view screen.
•
Follow the Installation instructions below (and review Section C of the User Guide).
•
After commissioning, the system may be customised by selecting further options in Section G -
Settings, within the User Guide.
Have a 10L bucket or similar container (not supplied) at the ready to hold the water that will be ejected while
the Filter Flush Mode is in operation. Open the filter access door on the front of the unit and the filter cartridge
will be exposed. Located to the rear RHS of the cartridge is a flush line, approx 600mm long and the flush
line stop cock. Place the valve end of the flush line into the bucket or container (not supplied).
NOTE:
the flush line may be extended using 1/4” JG tube (Not supplied)
5.2
-
Filter Flush (Model BHA; CHA & CSHA)
Section 5
Commissioning
5.1
-
CO
2
Purge (Model CSHA)
1.
Press the [START] button to commence the purging
process.
2.
Purge for 10 seconds and ensure all water has stopped
flowing through the tap. (You will hear the CO
2
gas
escaping from the tap).
3.
Press the [Stop] button.
4.
Press [Next] for the filter flush screen
NOTE:
at first commissioning, the system will select the CO
2
Purge screen automatically.
OPEN Position
CLOSED Position
ON
OFF
G4 Celsius Filter Flush Menu
Stop cock
operation