background image

804545NZ - BW_AB Small_09.18 v1.02 

Page 21 of 24

Warning: this appliance must be earthed. 

Following remedial service the earthing continuity of the heater must be 

checked by a qualified technician using an appliance tester, or continuity 

tester of accuracy Class 5 or better. Class 5 denotes an accuracy of 5% full 

scale deflection.
1. Isolate power supply.
2. Set meter to 0 ohm with leads connected together.
3. Connect one test lead to the earth pin on the three pin plug.
4. Connect the other test lead to a bare patch of metal (preferably on the 

edge) of the top of the cover, then to the front cover of the unit, and then to 

the tap.

Warning- the water may be boiling - show extra care.

5. Test that in every instance the electrical resistance does not exceed 1 

ohm.

Earthing Continuity Verification

If required, an earth continuity test 

can be performed by testing between 

the earth pin on the products lead 

and a exposed piece of metal on the 

case and the tap body.

Operating Procedures

Tap Operation

Boiling water

Zenith Autoboil is fitted with a two-way tap for filtered instant boiling 

water.
For instant boiling water, gently pull the top of the tap forward.
Boiling water will flow until the tap handle is released. 
This operation gives fingertip flow control for safe filling of cups and 

mugs.
To fill larger vessels such as teapots and saucepans, rotate the tap 

180 degrees and depress it until it locks into a horizontal position. 
Boiling water will flow until the tap is returned to its normal vertical 

position. This operation allows the vessel to be filled without 

holding your hand where it may be affected by steam. 

Содержание Autoboil 3 Litre White

Страница 1: ...oboil 3 Litre White 303651 Zenith Autoboil 3 Litre Stainless Steel 305652 Zenith Autoboil 5 Litre White 305651 Zenith Autoboil 5 Litre Stainless Steel 307652 Zenith Autoboil 7 5 Litre White 307651 Zen...

Страница 2: ...ren with reduced physical sen sory or mental capabilities or lack of experience and knowledge unless they have been given supervision or instruction concerning use of the appliance by a person respons...

Страница 3: ...n the case of the heater Frost protection If this heater is located where ambient air temperature could fall below 5 C when the heater is not in use do not turn off the appliance electrically This saf...

Страница 4: ...above the draining board height should be increased only if essential for filling larger vessels Provide clearance for service access of not less than 100 mm top 150 mm left 20 mm right Mark corner p...

Страница 5: ...cing Water pressure requirements Minimum 70 kPa maximum 700 kPa 3 2 Venting A vent at the base of the heater must be plumbed to a safe visible location as under certain conditions it may discharge col...

Страница 6: ...d attach to the chassis earth male terminal For a concealed electrical connection an isolation switch should be installed Check that the earth is connected through the PCB to the chassis with an ohm m...

Страница 7: ...arlier if you notice a persistent reduction in water pressure from the appliance or an unpleasant taste or odour in the water Refer to Filter Replacement section on page 21 for instructions of changin...

Страница 8: ...rom the tap outlet 5 Once the water is available from the tap turn off the mains water and close the tap outlet 6 Turn on the power to the unit water must be in the tank 7 Touch the white circle next...

Страница 9: ...and Buttons Move to the next item able to be highlighted Move to the previous item able to be highlighted Confirm menu selection Move to the previous menu Perform one of 3 functions 1 Move to the men...

Страница 10: ...ngs menu Filter Indication Days remaining of filter life Shown red filter needs replacement Sleep Mode Indication Unit will enter sleep mode at the time shown Unit will enter sleep mode when it is dar...

Страница 11: ...ngs Menu Select on the home screen to navigate to the main menu Choose Settings and select Choose an option and select 2 3 Sleep Override Mode Awake time remaining Unit will return back to sleep mode...

Страница 12: ...ibration to prevent excessive steam release or high energy usage see section 4 2 3 3 Settings Sleep Modes From the settings menu choose Sleep Modes and select Choose Sleep Trigger and select and to se...

Страница 13: ...on off timer settings for the 2 weekend days simultaneously Adjust on off timer settings for the 7 days separately Weekdays Weekends Individual Days 3 3 3 Timer Settings Individual Days Settings Choo...

Страница 14: ...this menu and on the home screen are based on these 2 parameters This action will reset the filter usage counter A reminder is shown to flush the new filter before doing this see page 21 Filter Replac...

Страница 15: ...ave changed requiring recalibration of the boiling point Incorrect boiling calibration points may cause excessive steam vent releases or increased energy usage Boiling calibration is recommended when...

Страница 16: ...e Product 5 2 Info Current Fault From the info menu choose Current Fault 6 Service Menu Note The service menu is used by technicians only for diagnostic purposes Menu Operation 5 Info Menu Select on t...

Страница 17: ...e Dimensions 25 40 70 329 1 5L 414 3L 448 5L 561 7 5L 37 55 56 76 273 1 5L 3L 302 5L 7 5L 310 1 5L 395 3L 429 5L 542 7 5L 37 1 5L 235 1 5L 37 3L 235 3L 52 5L 250 5L 52 7 5L 250 7 5L Cold Inlet Vent Ex...

Страница 18: ...4 19 90100NZ Grommet Cistern to Tank 20 94458NZ Overload 21 94459NZ Side release plug 22 94460NZ Seal transfer tube Item Kit Number Description 23 94483NZ Metering Tube 1 5 3 Ltr 94461NZ Metering Tube...

Страница 19: ...804545NZ BW_AB Small_09 18 v1 02 Page 19 of 24 Exploded View Diagram 1 11 2 3 4 7 6 5 13 39 38 34 35 21 36 24 8 10 25 9 26 23 22 19 15 40 16 17 20 14 12 18 27 28 29 30 31 32 33...

Страница 20: ...see section 3 3 or reset settings from service menu Check power supply Contact Zenith authorised agent Runs out of boiling water and fails to refill Outlet tap drips Overflow from vent Excessive stea...

Страница 21: ...he electrical resistance does not exceed 1 ohm Earthing Continuity Verification If required an earth continuity test can be performed by testing between the earth pin on the products lead and a expose...

Страница 22: ...lush by following the steps 1 4 only on pages 7 8 Step 7 Commissioning Go to Replace Fitler screen to reset the filter usage counter Follow the instructions on page 14 3 4 3 Replace Filter section for...

Страница 23: ...preserve our environment we ask that you dispose of this product correctly Please contact your local city council for collection centre details Cleaning Cleaning Case Do not use strong corrosive spray...

Страница 24: ...not be true representations of the finished goods The standard cup referred to in this publication is 167 ml 6 fl oz The standard glass is 200 ml 7 fl oz The terms Zenith Hydroboil Autoboil Econoboil...

Отзывы: