background image

 

 

Insert the two side panels (Part K) on the left and right-side channels.  

 

 

Step 3 

 Assemble Top 

 

Attach the pressure corners (Part F) 

to each end of two 22” aluminum frames (Part B

-A).  Make sure that the 

fingers from the corners align with the channels of the frame. (see the first photo) 

 

Attach a 46” aluminum frame (Part A) and 46” top door frame (Part D) to on

e of the side frames with the 

corners attached.  Make sure that the double door track is facing up and the inside channels all align (the logo 
should be upside down at this point). The frame and channels should now be in the shape of a U. 

Отзывы: