4.4.1.2 Front Panel

!

The

 

front

 

panel

 

consist

 

of

 

the

 

following

 

switches:

!

      

         

Zellabox 

Technical

 

data 

      

      

      

      

4.4

 

Switchboard

!

The

 

Zellabox

 

switchboard

 

sits

 

at

 

the

 

bottom

!

of

 

the

 

Micro

 

Data

 

Centre

 

and

 

is

 

responsible

!

for

 

providing

 

and

 

distributing

 

power

!

within

 

the

 

Micro

 

Data

 

Centre.

 

The

 

2

 

main

!

components

 

that

 

rely

 

on

 

this

 

power

 

are

 

the

!

UPS

 

and

 

the

 

Cooling

 

System.

!

!

The

 

UPS

 

provides

 

uninterruptible

 

power

 

for

!

the

 

client

ʼ

s

 

critical

 

equipment

 

as

 

well

 

as

 

the

!

fire

 

extinguishing

 

system,

 

which

 

is

 

housed

!

at

 

the

 

top

 

of

 

the

 

unit

 

and

 

the

 

access

 

control

!

system.

 

The

 

only

 

component

 

running

 

directly

!

from

 

the

 

switchboard

 

other

 

than

 

the

 

UPS

 

is

!

the

 

cooling

 

system

 

 

this

 

is

 

plugged

 

directly

!

into

 

the

 

switchboard.

!

!

4.4.1

 

Features

 

&

 

Functions

!

The

 

switchboard

 

is

 

plugged

 

or

 

hardwired

!

directly

 

into

 

the

 

building

ʼ

s

 

power

 

source

 

and

!

has

 

a

 

green

 

light

 

on

 

the

 

front

 

panel

 

which

!

MUST

 

be

 

illuminated

 

at

 

all

 

times

 

indicating

!

there

 

is

 

a

 

power

 

supply.

!

!

4.4.1.1 Back Panel

!

The

 

back

 

panel

 

consists

 

of

 

plug

 

points

 

for

 

the

!

following

 

components:

!

!

Mains Input sockets 

 6Kva switchboard

!

Main input cable 

 8Kva switchboard

!

Cooling

 

System

!

UPS 

!

Tag on switchboard

!

What does it refer to?

!

What does it do?

!

Main

 

Isolator

!

Mains

 

power

 

switch

!

Controls

 

the

 

mains

 

power

!

RCD

!

Residual

 

current

 

device

 or 

safety switch

!

Provides

 

fast

 

power

 

cut-off

 

in

 

problem

!

Situations.

!

Surge

 

Arrestor

!

A

 

protective

 

device

 

designed primarily

 

for

 

connection

 

between

 

conductor

 

of

 

an

 

electrical

 

system

!

Cooling

 

System

 

!

 5 & 6 Kva UPS

!

UPS

!

32amp supply 

!

1 to 3 Kva UPS

!

UPS

!

16 Amp supply

!

Power

 

available

!

!

Power

 

availability

 

within

 

the

 

MDC

!

!

When

 

the

 

light

 

is

 

on

 

there

 

is

 

power

 

within the

 

MDC.

!

!

Содержание Cubb

Страница 1: ...1 Zellabox User Manual...

Страница 2: ...2 Pyrorack 2 3 Uninterruptible Power Supply 2 4 Switchboard 3 Start up procedure 4 Technical Data 4 1 Access Control 4 2 Pyrorack 4 3 Uninterruptible Power Supply 4 4 Switchboard 4 5 Cooling System 4...

Страница 3: ...nd robust environment The Micro Data Centre eliminates the need for a server room Our micro data centres offer a robust and dependable answer to the question of housing and securing your networking an...

Страница 4: ...ructions 2 1 Overview Important safety note Caution needs to be taken when removing the side panels of the Micro Data Centre in particular when dealing with the 38U as they are heavy we recommend a 2...

Страница 5: ...ted Avoid exposure to the fire by products and extinguishing mixture Should it be necessary to enter the area before it is fully ventilated the use of a respirator or other means of protection may be...

Страница 6: ...p on or trip over them Do not connect domestic appliances such as hair dryers to UPS output sockets The UPS can be operated by any individuals with no previous experience Connect the UPS system only t...

Страница 7: ...e take the precautionary measures specified below and any other measures necessary when working with batteries Remove wristwatches rings and other metal objects Use only tools with insulated grips and...

Страница 8: ...DO NOT exceed the cooling system s recommended BTU h specifications listed in the cooling system section as this will overheat the equipment The Zellabox Micro Data Centre is a PLUG N PLAY unit theref...

Страница 9: ...nt panel indicators will be as follows Mode Indicator Door Indicator 9 Zellabox Technical data 4 Technical data 4 1 Access control 4 1 1 Metal Keypad Key Features 500 Users Water and vandal resistant...

Страница 10: ...Water and vandal resistant Backlight Backlit family option B Three user levels normal secure master Three modes of operation normal bypass secure Integrated keypad for PIN entry Piezo electric Q44 on...

Страница 11: ...irements The installation of this product should only be carried out by a competent person and comply with applicable current National or International standards 11 Zellabox Technical data 4 2 Pyrorac...

Страница 12: ...base correctly also check that the end of line resistor is in place on the detector base 4 2 3 3 System Fault Cause see all other Fault Indications and Detectors Remedy Check Detectors in place and p...

Страница 13: ...t every 3 months the following checks are carried out by a competent person Entries in the Log Book are checked and any necessary action taken Batteries and their connections should be examined and te...

Страница 14: ...Zellabox Technical data 4 3 Uninterruptibale power supply 4 3 1 Introduction Please refer to relevant UPS User Manual provided in the Zellabox or alternatively go online 14...

Страница 15: ...res Functions The switchboard is plugged or hardwired directly into the building s power source and has a green light on the front panel which MUST be illuminated at all times indicating there is a po...

Страница 16: ...but rather switching the cooling system off at the switchboard to reset the controls The recommended temperature setting is between 20 and 23 degrees for maximum efficiency Problem Potential Cause So...

Страница 17: ...ratures over 42 degrees within the data centre while a cooling unit is running the alternate unit will start up and provide extra cooling for the Micro Data Centre Once the temperature drops below 20...

Страница 18: ...ffer a simple user experience for seamless physical deployment configuration commissioning monitoring and power delivery Zellabox power distribution hardware will remain in place through multiple tech...

Страница 19: ...19 Zellabox Zellabox Pty Ltd PO Box 1035 Osborne Park DC Western Australia 6916 AUSTRALIA 1300 117 644 www zellabox com info zellabox com Version 2016 007...

Отзывы: