Models and arrangements
1
Ratings 4
Dimensions and data
7
General information
22
Safety considerations
22
Receiving 23
Unpacking and preparation
24
Handling and installation
25
Chilled/hot water connections 27
Ductwork connections
28
Electrical connections
29
Wiring diagram
30
Exposed unit touch-up
35
Start-up 35
Air system balancing
36
Cooling/heating system
36
Water system balancing
37
Water treatment
37
EC Motor
38
Control cards
38
Controls operation
38
Normal operation/maintenance 39
Replacement parts
41
Equipment start-up checklist
42
IMPORTANT: Submittal documentation, specific to
each project, supersedes the general guidelines
contained within this manual.