background image

 

Zehnder ComfoPost e ComfoPost ISO

 

Installation and maintenance manual for pre/post air treatment hydronic device

 

Version 2.1   12 2022 

 

 

 

 

 

 

 

 

Zehnder Group AG – 

www.zehndergroup.

com 

All right reserved. The manual has been complied with the utmost care. However, the publisher cannot be held liable for any damages resulting from the absence or inaccuracy of the 
information provided. 

 

 

Z

G

IT

-C

P

o

s

in

s

ta

lla

ti

o

n

 a

n

d

 m

a

in

te

n

a

n

c

e

V

1

2

2

2

it

 e

n

,s

u

b

je

c

to

 m

o

d

if

ic

a

ti

o

n

 

Zehnder ComfoPost is a post treatment coil (heating/cooling) to be installed in combination with a Zehnder 
ComfoAir  comfort  ventilation  unit.  The  addition  of  the  Zehnder  ComfoPost  ISO  coil  allows  isothermal 
dehumidification during the summer season. 

Install the unit with a slight inclination towards the condensate drain hole. The condensate drain must be 
suitably inclined and adequately protected against frost. 

Attention:

  ALWAYS  connect  the  condensate  drain  at  the  bottom.  Make  a  siphon  near  the 

ComfoPost unit before connecting to other drains. 

Insulate the supply pipes and connections to Zehnder ComfoPost and ComfoPost ISO (cold/hot water) with 
a  suitable  thickness  of  insulation.  Insulate  the  air  supply  pipes  with  a  suitable  thickness  of  insulation. 
Insulate the mounting plate. 

Zehnder ComfoPost and ComfoPost ISO may only be installed and used in a residential environment or an 
environment with similar conditions, free from aggressive chemicals of any kind.  

Zehnder ComfoPost and ComfoPost ISO must be supplied with water at a temperature included between 
5 and 55 °C, suitably treated according to UNI 8065. 

 

PERMITTED INSTALLATIONS  

NOT PERMITTED INSTALLATION 

 

It is not permitted to install the ComfoPost with the air flow directs downwards 

 

It is not permitted to connect the upper drain connection  

 

It not permitted to install the ComfoPost vertically with the water connection on the top 
or bottom 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

MAINTENANCE REQUIREMENTS 

For the correct operation of the system and to maintain the warranty: 

- Regular maintenance of the ventilation unit is absolutely essential. The filters must be checked every 3 months and replaced with 
original Zehnder filters every 6 months; 

- The filters  must be checked  every  3  months  and replaced with original Zehnder filters  every  6  months;  maintenance  must be 
carried out annually by an authorised service centre, which will draw up a service report; 

- At the beginning of the summer season, the Technical Assistance Centre must carry out an inspection during which it will change 
the filters of the unit, check the slope and the patency of the condensate drain, clean the finned pack of the ComfoPost battery and 
ComfoPost ISO (if present). 

The ventilation unit MUST  only operate with the original filters correctly positioned.  This will  prevent  fouling of the  exchanger of the 
ventilation unit and the finned pack of the ComfoPost and ComfoPost ISO coil (if present). 

In the absence of documented proof of maintenance by a Technical Service Centre, no warranty will be recognised for damage due to 
lack of maintenance or neglect by the User. 

Full manual:

Отзывы: