background image

3.5 Commissioning – Systems 3 and 4 only

Have controls been set-up in accordance with the manufacturer’s recommendations?

Have all distribution grilles been locked to prevent unauthorised adjustment?

3.6 Test Engineer’s Details

Name

Company

Address Line 1

Address Line 2

Telephone Number

Post Code

Signature

Competent Person Scheme/

Registration Number (if applicable)

Date of Test

Yes

No

Yes

No

8

Содержание Centair CMEV.4e

Страница 1: ...CMEV 4e CMEV 4eHT Mechanical Extract Ventilation MEV System User Homeowner Guide Commissioning and Inspection Record Located on page 5 of this guide should have been completed by the Commissioning En...

Страница 2: ...uarantee Warranty Information 11 Contents Overview Your home has a continuously running ventilation MEV system installed This consists of a central extract system that is linked by a network of ducts...

Страница 3: ...supervision Where an open flued oil or gas fuelled appliance is installed precautions must be taken to avoid a back flow of gases into the room If the supply cord is damaged it must be replaced by a s...

Страница 4: ...ement For installations where the unit is hidden behind a panel we recommend a minimum size access panel of 600mm2 This is to ensure that the ducts can be disconnected and reattached with ease See Fig...

Страница 5: ...o the installation of which should be incorporated into the Home Information Pack for the homeowner to keep Part 1 System details and declarations Part 2a Installation details Part 2b Inspection of in...

Страница 6: ...l internal doors have sufficient undercut to allow air transfer between rooms i e 10 mm over and above final floor finish Has all protection packaging been removed including from background ventilator...

Страница 7: ...Inspection completion Yes No Measured Air Flow High Rate l s Design Air Flow High Rate l s Refer to Table 5 1a ADF Measured Air Flow Low Rate l s Design Air Flow Low Rate l s Refer to Table 5 1a in AD...

Страница 8: ...turer s recommendations Have all distribution grilles been locked to prevent unauthorised adjustment 3 6 Test Engineer s Details Name Company Address Line 1 Address Line 2 Telephone Number Post Code S...

Страница 9: ...ition and Description of Visual Filter Warning Internet Address for Preassembly Disassembly Instructions AEC kWh electricity a for Each Climate Cold Average Warm AHS kWh electricity a for Each Climate...

Страница 10: ...10...

Страница 11: ...eenwood co uk info greenwood co uk All information is believed correct at time of going to press E OE All dimensions referred to are in millimetres unless otherwise shown All goods are sold according...

Страница 12: ...Issue 4 January 2018 Zehnder Group UK Limited Watchmoor Point Camberley Surrey GU15 3AD Customer Services 44 0 1276 408404 Technical Services 44 0 1276 408402 Email info greenwood co uk Web www greenw...

Отзывы: