Part 2a – Installation details
2.1 Installation Checklist – General (all Systems) Tick as appropriate
Has the system been installed in accordance with
manufacturer’s requirements?
Have relevant system installation clauses been followed as detailed in
Tables 1, 3, 5 and 7 as applicable?
Type of ductwork installed
(e.g. rigid, semi-rigid)
If any deviation from Tables 1, 3, 5 and 7,
these should be detailed here.
Description of installed controls (e.g. timer,
central control, humidistat, PIR, etc)
Location of manual/override
controls
This section should be used to record all installation details. The Commissioning Engineer should use the
following Parts 1 to 3, to record important information relating to the installation, of which, should be
incorporated into the Home Information Pack for the homeowner to keep.
•
Part 1
– System details and declarations
•
Part 2a
– Installation details
•
Part 2b – Inspection of installation
•
Part 3 – Air flow measurement test and commissioning details
4.4.1
5
4.0
Commissioning & Inspection Record
Part 1 – System details and declarations
1.1 Installation Address Details
Dwelling Name/Number
Street
Locality
Town
County
Post Code
1.2 Installation Details
System Classification*
System 3 – Mechanical Extract Ventilation
Manufacturer
Zehnder Group UK Limited
Model Number
Serial Number (where available)
Location of MEV Unit
*Note. If a system has been installed that is not defined by System 1 to 4 in Approved Document F, further installation checks
and commissioning procedures may be required. Seek particular guidance from the manufacturer for these systems.
Yes
No
Yes
No