Solo documento principale.
Ident
ific
at
ion:
M
D
-AL
-GI
-00
R
ev
. 4
.0
of
31.
01.
18
–
A
ppl
ic
at
ion:
G
ID
Pile Reg. IT12110P00002965 -
Share Capital € 100,000.00 fully paid up
AR Bus. Reg. no. 03225010481
– AR REA no. 94189
ISO 9001 Certified company - Certificate no. 9151 - CNS0 - IT-17778
Zucchetti Centro Sistemi S.p.A. - Green Innovation Division
Via Lungarno, 248 - 52028 Terranuova Bracciolini - Arezzo, Italy
tel. +39 055 91971 - fax. +39 055 9197515
[email protected] - [email protected] -
zcsazzurro.com
Manual of 25/05/2020 Rev. 1.0 “User Manual 22K-BE-24”
21/44
Before making any electrical connections, make sure there is no AC
current. Zucchetti Centro Sistemi Spa assumes no responsibility for any
liabilities arising from the use of this product. Installation must be carried
out by a qualified professional with the skills and knowledge to build,
install and operate electrical systems, and who has been trained on how to
identify and prevent potential risks.
Attention
The charging station must be installed and serviced by professional
technicians or electricians.
Attention
The charging station must be installed and serviced by professional
technicians or electricians.
Attention
3.1.
Connecting PGND cables (grounding)
Connect the charging station to the ground electrode using the ground protection cables (PGND).
Prerequisites:
Prepare the PGND cables to be connected (it is recommended to use outdoor power cables with a
cross-section of 6 mm
2
suitable for grounding).
Procedure:
1)
Remove a suitable length of the external insulation layer using a wire stripper, as shown in Figure 10.
Note:
L2 is approximately 2- 3 mm longer than L1
Figure 10 – Preparing the ground cable (1)