QUICK GUIDE
HYD3000-HYD6000-ZP1 HYBRID
INVERTER
Rev. 1.0
–
23/10/2023
Always wear protective clothing and/or personal protective equipment
General notice -Important Safety Instructions
1
Always consult the manual
Страница 1: ...K GUIDE HYD3000 HYD6000 ZP1 HYBRID INVERTER Rev 1 0 23 10 2023 Always wear protective clothing and or personal protective equipment General notice Important Safety Instructions 1 Always consult the ma...
Страница 2: ...METER AND DDSU PRODUCTION METER 10 2 5 CHECKING CORRECT DDSU METER READING 10 3 READING VIA DDSU METER 10 3 1 SETTING DTSU METER 10 3 2 CHECKING CORRECT DTSU METER READING 11 INITIAL SET UP PROCEDURE...
Страница 3: ...DISTANCES Dimensions and distances to be observed To guarantee adequate room for both installation and effective heat dissipation make sure there is ample space around the 1PH HYD3000 HYD6000 ZP1 resi...
Страница 4: ...ll the base remove it and drill the holes using an impact drill with an 8 mm diameter bit drilling to a depth of 60 65 mm Tighten the expansion screws to firmly secure the base in place Step 3 Use a f...
Страница 5: ...ll support panel B on the wall and fasten the expansion bolt Step 3 Adjust support panel A making sure that the holes on both panel A and B are perfectly aligned Step 4 Connect and secure panel A and...
Страница 6: ...ator 3 Button 2 System status indicator 4 LCD screen MENU BACK UP DOWN ENTER FORWARD System status Indicator Blue LED Green LED Red LED On Grid On Standby On Grid Intermittent Off Grid On Alarm Interm...
Страница 7: ...Logic interface 6 Factory reset 7 Parallel settings 8 Bluetooth Reset 9 CT Calibration 10 Set electricity meter 11 Neutral Point Grounding PWD 0715 1 List of current events 2 List of historical events...
Страница 8: ...the conductor 8 AWG N W PE O 6 PHOTOVOLTAIC CONNECTIONS Cross sectional area mm2 Outer cable area mm2 Range Recommended value 4 0 6 0 4 0 4 5 7 8 Recommended specifications for DC input cables Insert...
Страница 9: ...ngs to the inverter check that the DC circuit breaker on the side of the inverter is in the OFF position 7 COMMUNICATION CONNECTION COM PORT Icon Definition Function Note 1 Link Port 1 Parallel Signal...
Страница 10: ...igent counter signal 485 7 MET B RS485 B differential signal 8 CAN H CAN high speed data CAN battery communication signal 9 CAN L CAN low speed data 10 N D N D 11 N D N D 12 GND Logical interface sign...
Страница 11: ...ected in parallel to B B of battery module 2 B B of battery module 2 connected in parallel to B B of battery module 3 1 1 2 3 Connect the grounding cables as shown in the figure COM 1 of inverter Link...
Страница 12: ...ttery module 1 Link Port IN of battery module 2 Insert the terminating resistor on Link Port OUT of battery module 2 COM 1 of inverter Link Port IN of battery module 3 Link Port OUT of battery module...
Страница 13: ...ected in two independent groups to the inverter s battery input interface The battery capacity varies from 5 to 20 kWh in the case of 4 batteries it is necessary to purchase the extension kit code ZZT...
Страница 14: ...BLE use all the coloured pins blue orange green brown to extend the positive cable of the CT and all the white coloured pins white blue white orange white green brown to extend the negative cable of t...
Страница 15: ...The sensor must include all phase cables entering or exiting the meter 10 2 MEASURING EXCHANGE VIA DDSU METER PIN INVERTER PIN METER Note 6 24 Communication of the Exchange Meter 7 25 15...
Страница 16: ...to 001 In addition to what is described above the display shows the values of Current Voltage Power factor Power NOTE For distances between the meter and hybrid inverter of more than 100 metres it is...
Страница 17: ...stem and loads direction phase 1 Connect Meter and inverter via the RS485 serial port On the Meter side this port is identified by PINs 24 and 25 On the inverter side use the COM port by connecting PI...
Страница 18: ...figurations are required on the inverter for the external production meter setting 10 2 4 CONFIGURING DDSU EXCHANGE METER AND DDSU PRODUCTION METER 1 2 Production meter address setting Press and hold...
Страница 19: ...egative value In the case of a meter for reading the production of existing photovoltaic systems repeat the previous steps 1 This time the sign of the powers must be positive for P 2 Switch on the Hyb...
Страница 20: ...entified by PINs 24 and 25 On the inverter side use the connection port identified as COM by connecting PINs 6 and 7 NOTE For distances between the meter and hybrid inverter of more than 100 metres it...
Страница 21: ...by the meter as production power A maximum of 3 meters can be set for the production Addresses 02 03 and 04 d Press ESC to confirm 1 Meter on Exchange Meter on Production Note In case of CT sensors o...
Страница 22: ...ast 200 W by using a current clamp to measure under the import export meter Current flow Loads Import Export meter Switch on the batteries 1 Set the disconnect switch to ON 2 Press the button Once pre...
Страница 23: ...t onto the USB flash drive and import it 4 Setting battery parameters Default values are shown according to the input channel configured 5 Set up is complete 1 Settings 2 Date and Time Date and Time 3...
Страница 24: ...TION 2 Restore AC voltage by activating the dedicated switch OFF GRID OFF 1 2 Battery OFF 3 ON GRID OFF 1 2 3 OFF 3 Check that the power value shown on the grid display closely matches the power consu...
Страница 25: ...ange Heat pumps or pumps Load may vary over time Lights or hairdryers Load remains constant over time 4 Switch on the photovoltaic system by flipping the DC circuit breaker to the ON position 5 Switch...
Страница 26: ...rectly set enter the display menu and go to Inverter Info Check the data especially those highlighted Power level 6 kW Service Code Version Measured value of the insulation resistance Inverter Info 5...
Страница 27: ...t be supported by the inverter in EPS mode due to their specific waveform requirements Identify critical or priority household loads it is advisable to identify household loads that are vital during p...
Страница 28: ...tical loads are supplied directly by the mains eliminating the need for a double switch over contactor This operation is shown in the figure below It should also be noted that the LOAD output remains...
Страница 29: ...e the alternating voltage supplied by the grid will be lost This condition will cause the internal contacts of the hybrid inverter to switch over Once the preset activation time has elapsed the invert...
Страница 30: ...the DC circuit breaker of the inverter is in the OFF position 1 2 Switch on the batteries Switch on the photovoltaic system by turning the switch to the ON position 3 ON 18 1 OFF GRID MODE ONLY 18 2...
Страница 31: ...rallel switchboard It is necessary to ensure that the connections between each inverter and the parallel switchboard have The same length The same cross section The lowest possible impedance It is adv...
Страница 32: ...rging function Charging start and end time Maximum charging percentage Charge power Charging period Weekdays on which the mode is activated Once the preferred settings have been made scroll to the ini...
Страница 33: ...th the excess energy When the battery is fully charged or when the charging power is limited to preserve the integrity of the battery the excess energy will be exported to the grid Charge When the pow...
Страница 34: ...tion and the power required by the loads is less than 100W the battery reaches full charge status and the photovoltaic production exceeds consumption by at least 100W the battery is flat and the photo...