Assembly and usage instructions
12
1
2
2
1
8.
Fit toeboards
Fig. 7.3
Fig. 8.1
Fig. 8.2
Fig. 7.2
2.7. Note on dismantling the scaffold tower
To dismantle the scaffold tower, follow the steps for assembly in reverse order. Before
commencing dismantling, ensure that the necessary platforms or scaffold planks are installed
again and laid flat for personnel to stand on. No part of the scaffold tower (braces, platforms etc.)
may be removed before the levels above have been completely dismantled.
1
1
2
3
2
Fig. 7.4
Fig. 7.1
7.
Put other frames, advanced
guardrails and platforms like
in the way before.
Fig. 7.5
1
2
3
4
5
Содержание Z 600 S-PLUS
Страница 1: ...Assembly and usage instructions Z 600 S PLUS scaffold towers...
Страница 2: ...Assembly and usage instructions...
Страница 38: ...Assembly and usage instructions 38 NOTES...
Страница 39: ...Assembly and usage instructions 39 NOTES...
Страница 40: ...Assembly and usage instructions 40 NOTES...
Страница 41: ...Assembly and usage instructions 41 NOTES...
Страница 42: ...Assembly and usage instructions 42 NOTES...
Страница 43: ......
Страница 44: ...No 291358 EN 01 02 2014...