Assembly and usage instructions
Z600 brace-free mobile scaffold towers
21
Z600
3. Note on dismantling the scaffold tower
To dismantle the scaffold tower, follow the steps for assembly in reverse order. Before commencing
dismantling, ensure that the necessary platforms or scaffold planks are installed again and laid flat
for personnel to stand on. No part of the scaffold tower (braces, platforms etc.) may be removed before
the levels above have been completely dismantled.
4. Usage regulations
1.
Personnel must always climb to the work platform from
the inside of the tower.
2. Personnel are prohibited to brace themselves against the
side protection while working.
3. Jumping on the platforms is prohibited.
4. Horizontal loads which could cause the scaffold tower to tip over must not
be generated, e. g. as a result of working on adjacent constructions.
5. Particular attention must be paid to wind conditions which might cause the scaffold tower to
tip over when it is used in buildings open to the passage of wind, in uncovered buildings or at
the corners of buildings.
6. Using ladders, crates or similar means to increase the height of the platform is prohibited.
7. Tools and materials may only be handed upwards. Always take the weight of tools and
materials into consideration to avoid overloading the work platform. The person handing
the load upwards must not let go of it until the person receiving it has a firm hold on it.
8. Scaffold towers with swivel castors can be moved to their final location after assembly
(the ground or floor must not slope by more than 3 %). Any impact must be avoided.
When the scaffold tower is in its final position, the alignment must be checked again.
9. When moving the scaffold tower, always take care that it does not touch any live equipment.
10. Electrical tools (drills etc.) may only be operated on the scaffold tower at Safety Extra Low
Voltage (48 V), with protective insulation (separation transformer) or if they are connected
with a ground fault circuit interrupter with a residual current of 30 mA. The stipulations of
BGI 594 (formerly ZH 1/228) must be complied with.
11. Tools and materials must be stored on the work platform in such a way that there is
a passageway of 20 cm at the sides of the work platform.
Содержание Skymaste Industrial Z600
Страница 1: ...Assembly and usage instructions www zarges de Z600 brace free mobile scaf fold towers...
Страница 2: ......
Страница 28: ...Assembly and usage instructions Z600 brace free mobile scaffold towers 28 NOTES...
Страница 29: ...Assembly and usage instructions Z600 brace free mobile scaffold towers 29 Z600 NOTES...
Страница 30: ...Assembly and usage instructions Z600 brace free mobile scaffold towers 30 NOTES...
Страница 31: ......
Страница 32: ...No 291304 No 5021722 v0109...