background image

12/2021 

P/N 122328-01

en

  Aluminium Towers  

3T – Through The Trapdoor

Содержание PAX Tower 5535212

Страница 1: ...12 2021 P N 122328 01 en Aluminium Towers 3T Through The Trapdoor...

Страница 2: ...5 Maintenance storage transport 6 3 Assembly overview 7 4 Technical Data 9 5 Quantity Schedule 10 6 Assembly Procedure 12 6 1 Assembling the base unit 0 6m PH 12 6 2 Assembling the 3T mobile towers 1...

Страница 3: ...ns to ensure your system is erected easily and safely using the 3T Through The Trapdoor method The law requires that personnel erecting dismantling or altering towers must be competent Any person erec...

Страница 4: ...le person but it is recommended that for 5 6 m PH a second person is used to pass up components 2 1 Lifting of equipment Tower components should be lifted using a reliable lifting material e g strong...

Страница 5: ...hile still safe to do so Wind description Beaufort scale Beaufort No Speed in mph Speed in m sec Medium Breeze Raises dust and loose paper twigs snap off 4 8 12 4 6 Strong Breeze Large branches in mot...

Страница 6: ...indentation greater than 5 mm should not be used and put to one side for manufacture repair Adjustable leg threads should be cleaned and lightly lubricated to keep them free running Brace claws frame...

Страница 7: ...7 3 Assembly overview PAX Tower Base Unit 0 6 m PH Art No 5535212 PAX 3T 1 6 m PH Art No 5535122...

Страница 8: ...PAXTower 3T Instruction Manual 8 PAX 3T 3 6 m PH Art No 5535142 PAX 3T 5 6 m PH Art No 5535162...

Страница 9: ...g Working height 2 6m Scaffold height 1 6m Platform height 0 6m PAXTower 3T 1 6m PH Art No 5535122 Weight 70 4kg Working height 3 6m Scaffold height 2 6m Platform height 1 6m PAXTower 3T 3 6m PH Art N...

Страница 10: ...5535142 5535162 0 6m PH 1 6m PH 3 6m PH 5 6m PH 2 6m WH 3 6m WH 5 6m WH 7 6m WH 5535102 Base Pack 1 1 1 1 5535502 EN1004 Pack 1 1 1 1 5535532 1m Extension Pack 3T 1 1 1 5535542 2m Extension Pack 3T 1...

Страница 11: ...3T 5535542 Stabiliser Extension Pack 3T 5535512 Adjustable Leg Pack 5427942 42780 Folding Frame 1 42784 Platform 1 1 42781 4 Rung Frame 2 42782 8 Rung Frame 2 42788 Horizontal Brace 1 4 42787 Diagona...

Страница 12: ...osition 1 3 2 2 Push out the central folding frames until the locking hinge snaps into position and the lock is engaged 3 Apply the brakes on all castors Ensure the castors are facing outwards from th...

Страница 13: ...egs must be used see page 20 5 Fit the double guardrail on to the top rung of the base unit 6 Fit stabilisers to all four corners For the position of the stabilisers see page 23 7 Fit both end toe boa...

Страница 14: ...the bottom rung as shown 3 Remove the frame end caps Check that the ground is flat and all four castors are touching the ground Use a spirit level to check the base unit is level within 1 If the towe...

Страница 15: ...dlocks are engaged 1 2 6 Attach one stabiliser to each corner of the tower ensuring all four stabilisers touch the ground For the position of the stabilisers see page 23 If building to 5 6 m PH the st...

Страница 16: ...th rungs using the 3T method If building to 3 6m or 5 6m fit two guardrails to the 8th rung and two guardrails to the 10th rung using the 3T method The tower now has a platform height of 1 6 m If fini...

Страница 17: ...the 3T method If building to a platform height of 3 6m fit two double guardrails to the 16th and 18th rungs using the 3T method If building to 5 6m fit two guardrails to the 16th rungs and two guardr...

Страница 18: ...3T Instruction Manual 18 12 Insert both end toe boards so that the guide pins of the platform engage in the grooves of the end toe boards 13 Slide the side toe boards in on both sides The tower is now...

Страница 19: ...t follow the steps for assembly in reverse order No part of the tower unit braces platforms etc may be removed before the levels above it have been completely dismantled 1 Release the spring clips of...

Страница 20: ...y of the tower unit Only use the adjustable legs to level out uneven surfaces 1 Release the screw of the swivel castor 2 Pull the swivel castor out of the tubing 3 Release the nut and remove the two p...

Страница 21: ...the tube of the base unit as far as the stop 8 2 Fitting stabiliser extensions 1 Remove the end tube from the base stabiliser 2 Insert the stabiliser extension into the base stabiliser and lock 3 Inse...

Страница 22: ...PAXTower 3T Instruction Manual 22 4 Attach one stabiliser to each corner of the tower ensuring all four stabilisers touch the ground For the position of the stabilisers see page 23...

Страница 23: ...23 9 Dimensions A B 675 850 1800 D1 D2 C1 C2 A B 1800 A B C1 D1 C2 D2 Castor w adapter min 255 919 Castor w adapter max 320 984 Tower PH 0 6m 1 6m 3 6m 3993 2873 Tower PH 5 6m 5107 3987...

Страница 24: ...PAXTower 3T Instruction Manual 24 10 Identification EN1004 3 6 6 XXCD H2 D C A B A Brand B Safety pictograms C Tower designation D Manufacturer and manufacturer s address...

Страница 25: ...s must not be used again Push on end frame Check for warping crushing and cracks Check the presence of interlock clips Braces diagonal guardrails Check for warping crushing cracks and correct function...

Страница 26: ...of swivel castors with adjustable legs also check that the adjustable legs move easily Check the drop out protection wing bolt securing plug on the chassis beams and base frame Interlock clips Check f...

Страница 27: ...27...

Страница 28: ...cts and services please contact ZARGES UK Ltd Unit 8 Holdom Avenue Saxon Park Industrial Estate Bletchley Milton Keynes MK1 1QU Milton Keynes MK1 1QU Phone 44 1908 641118 Fax 44 1908 648176 sales zarg...

Отзывы: