13
Check that the ground is flat, and all four castors are
touching the ground. Use a spirit level to check the base is
level within 1°.
If the tower is not level within 1°, adjustable legs must be
used (see page 20).
5. Fit the double guardrail on to the top rung of the base unit
6. Fit stabilisers to all four corners. For the position of the
stabilisers, see page 23.
7. Fit both end toe boards so that the guide pins of the
platform engage in the grooves of the end toe boards.
8. Fit side toe boards on the folding frame.
The tower is now complete at 0.6m platform height.
Содержание PAX Tower 5535212
Страница 1: ...12 2021 P N 122328 01 en Aluminium Towers 3T Through The Trapdoor...
Страница 7: ...7 3 Assembly overview PAX Tower Base Unit 0 6 m PH Art No 5535212 PAX 3T 1 6 m PH Art No 5535122...
Страница 8: ...PAXTower 3T Instruction Manual 8 PAX 3T 3 6 m PH Art No 5535142 PAX 3T 5 6 m PH Art No 5535162...
Страница 27: ...27...