14
10.
Repeat steps 3, 5 and 6
until the scaffold height
is reached.
11.
Attach the top platform
in the centre and lock it
at two opposite points.
3
1
1
2
12.
Insert both end
toeboards (U-profiles
are open towards
the top).
13.
Push in the side
toeboards on both
sides.