15
5.
BEFORE INSTALLATION
5.1
Tools needs for installation
1.
Level gauge
2.
Electric drill
3.
Hole core drill (ø55mm / ø70mm)
4.
Flaring tool set
5.
Specified torque wrenches
6.
Spanner (half union)
7.
A glass of water
8.
Hexagonal wrench (5mm)
9.
Gas-leak detector
10.
Vacuum pump
11.
Gauge manifold
12.
Users manual
13.
Thermometer
14.
Multimeter
15.
Pipe cutter
16.
Measuring tape
17.
Screw driver ( Phillips and slotted )
18.
Pliers and flash cutter
19.
Socket wrench set & allen wrench set
20.
Allen tools
21.
Rubber wedge hummer
22.
Adjustable spanner
23.
R410A Gas tank
24.
Extension cable
25.
Vinyl tape
26.
Gas charge hose & scales
27.
Plaster & spatula
28.
Pipe bending kit
5.2
Accessories
Number
Name of Accessories
Quantity
1
Indoor unit mounting plate
1
2
Clip anchor
6
3
Self-tapping screw
6
4
Remote control
1
5
Remote control holder
1
6
Battery (AAA 1.5V)
2
7
Flare nut (for liquid pipe)
1
8
Flare nut (for gas pipe)
1
9
Decorative tape
1
10
Connection piping assembly
1
11
Insulation hose for refrigerant piping
1
12
External power cable
1
13
Drain hose
1
14
Interconnection cable
1
15
Drain apparatus
1
Note: Other necessary parts for the installation, besides the above mentioned, must be provided by the customer/installer.
5.3
Installation details
5.3.1
Wrench torque sheet for installation
Outer Diameter (mm)
Torque (N.m)
Additional Torque (N.m)
Ø 6,35 (1/4”)
15(1.53kg.m)
17(1.73kg.m)
Ø 9,52 (3/8”)
34(3.47kg.m)
37(3.77kg.m)
Ø 12,70 (1/2”)
50(5.1kg.m)
54(5.5kg.m)
Ø 15,88 (5/8”)
68(6.95kg.m)
72(7.34kg.m)
Содержание ZS12V70CCHI
Страница 1: ...EN Service Manual Split Type Air Conditioner ...
Страница 61: ...EN ...