49
SERVICING
Installation and Servicing
62 BOILER SEALING PANEL SEAL REPLACEMENT
61
EXPANSION VESSEL RECHARGING & REPLACEMENT
8
1.
Refer to Frame 41.
2.
Remove the old seal from the casing and
thoroughly clean the casing surfaces.
3.
Fit the new seal, ensuring the bottom joint
provides an air tight seal.
4.
Reassemble in reverse order.
5.
Check operation of the boiler. Refer to
Frames 30 & 31.
Note.
Ensure that the boiler front panel is
correctly sealed, compressing the seal
to make an airtight joint.
RECHARGING
1.
Remove the charge point cover.
2.
Recharge the tank pressure to 0.75 bar.
3.
Re-assemble in reverse order
4.
Check operation of the boiler. Refer to Frames
30 & 31.
REPLACEMENT
5.
Refer to Frame 41.
6.
Drain the boiler CH circuit. Refer to Frame 53.
7.
Remove the retaining clip on the vessel water
connection pipe.
8.
Support the expansion vessel and unscrew
the 2 screws from the securing clamp, located
on the top of the boiler, and remove. (Note the
position of the bracket on the vessel)
9.
Remove the expansion vessel.
10.
Fit the new expansion vessel.
11.
Reassemble in reverse order ensuring the
“o” ring is in place.
12.
Refill the boiler. Refer to Frame 23.
13.
Check operation of the boiler. Refer to Frames
30 & 31.
Recharge
Point
7
SER
VICING
Содержание ULTRA SYSTEM 15
Страница 4: ...4 Installation and Servicing ...
Страница 56: ...56 SHORT LIST OF PARTS Installation and Servicing ...
Страница 62: ...62 NOTES Installation and Servicing ...
Страница 63: ...63 NOTES Installation and Servicing ...