■
Setup procedures
Set up according to the numerical order.
11
Assembling
the base
1
Drive the pegs into the ground
to hold auxiliary rope for
strong wind and rolling of
panel
3
Panel flips up
4
Assembling
the ends
2
V-Peg
Y-Peg
【
Prepare in Advance
】
*Make a loop on pegs with commercially available rope
*Close all zippers
φ
2mm
・
20cm