Overview of operating and control elements
34
HDK350_EN_01_2005-05-10
Display panel
The display panel at the
switchbox is equipped
with LEDs (light emitting
diodes) and a digital
display, indicating the
operating status of the
dryer:
Display panel at the switchbox
LED
Power
(1)
LED is on when dryer is switched on.
Flow diagram (2)
The current operating phases of the dryer are indicated by means of 4 LEDs:
Vessel B1:
Vessel B2:
Regeneration 1
Regeneration 2
Adsorption 1
Adsorption 2
Depending on the operating phase, the following LEDs might be on
simultaneously:
Adsorption B1
and
regeneration B2
or
regeneration B1
and
adsorption B2
.
Содержание HDK 50/100
Страница 1: ...High Pressure Dryer HDK 50 100 600 350 Operating Instructions Issue 05 2005 EN...
Страница 3: ......
Страница 4: ......
Страница 6: ......
Страница 68: ...Logic control diagram 68 HDK350_EN_01_2005 05 10 Logic control diagram Adsorption in B1 and regeneration in B2...
Страница 69: ...Annex with technical documentation HDK350_EN_01_2005 05 10 69 Regeneration in B1 and adsorption in B2...
Страница 72: ...Dimensional drawing 72 HDK350_EN_01_2005 05 10 Items Option...