Zaiput Flow Technologies BPR-1000 Скачать руководство пользователя страница 4

                                                                                                         

1 | 

P a g e

 

 

General Information 

 

This manual provides information about the installation, operation, and safety precautions of 

Zaiput Flow Technologies laboratory scale  Back Pressure Regulator (BPR-1000). We recommend 

keeping this manual near the device for quick and easy reference. 

 

The device is designed for the maintenance and use of a user selected value of back-pressure in a 

flow system or batch vessel. The device has two methods of operation: “Set It and Forget It”, 

“Pressure Relief” or “Adjustable on Demand”.  

 

1.1.

 

Box Content 

 

 

BPR Unit – 1 Piece 

 

Link to this instruction manual 

 

A connector for the charging valve. 

 

4 Peek nuts 2 PFA Swagelok front ferrules for ¼” tubing 

 

2 PFA Swagelok back ferrules for ¼” tubing 

 

1.2.

 

Technical Data  

     

 

Operating parameters 

Total Flow Rate 

20-500 ml/min (error <2%) 

500-1000 mL/min (error <5%) 

Dimensions 

97 x 97 x 64 mm 

Set Point Pressure Range 

0.2-2 Mpa (29-290 PSI) 

Maximum Inlet Pressure 

5 MPa 

Ports 

¼ UNF - 28 flat bottom 

Wetted materials 

Fluorinated Polymers (ETFE, PFA) 

Max operating temperature 

130 °C 

Internal volume 

8 mL 

 

1.3.

 

 Principle of operation 

 

 

This Back-Pressure Regulator  compares the pressure of the process fluid (main stream)  to a 

 

reference pressure. Flow of the main stream is allowed only if its pressure meets or exceeds 

 

the reference pressure. This reference pressure is set by charging the BPR with gas through the 

 

valve on the top of the device.   

 

 

 

 

 

 

Содержание BPR-1000

Страница 1: ...Zaiput Flow Technologies Separation Made Simple Instruction Manual BPR 1000 Zaiput Flow Technologies 101a 1st Ave Waltham MA 02451 ph fax 617 714 9806 Email sales zaiput com http www zaiput com...

Страница 2: ...red with care If you are unsure of operation contact a Zaiput representative for assistance Zaiput assumes no liability for direct subsequent or consequential damages arising from an incorrect use of...

Страница 3: ...rinciple of operation 1 1 4 Device Schematics 2 2 Safety Precautions 2 3 Setup Operation 2 3 1 Methods of operation 4 3 3 Technical Notes Best Practices 5 4 Maintenance 5 4 1 Cleaning the Device After...

Страница 4: ...for the charging valve 4 Peek nuts 2 PFA Swagelok front ferrules for tubing 2 PFA Swagelok back ferrules for tubing 1 2 Technical Data Operating parameters Total Flow Rate 20 500 ml min error 2 500 1...

Страница 5: ...exist The device has not been installed properly The device is partially dismantled Service has been attempted by unauthorized or unqualified personnel The device is not correctly assembled or leaks...

Страница 6: ...ng port This port comes capped it does not include a valve and it is recommended for permanent installations or during dynamic set point operations see below Process fluids connections Ports are desig...

Страница 7: ...lue The advantage is that a gas tank is not required for operation The BPR should be repressurized every 48 hours for consistent results Method 2 Dynamic Set Point Some processes require the fluid pre...

Страница 8: ...essure of the gas fluctuates so will the set point of the device Best Practices To prevent damage to the valve do not over tighten the valve finger tight with a small flat head screwdriver is sufficie...

Страница 9: ...r has begun to leak it can easily be replaced by the user Please contact a Zaiput representative for part replacement Similarly if the connector is lost or damaged it can be easily replaced and your Z...

Страница 10: ...discuss your application You may contact us by phone 1 617 714 9806 or by email Technical Questions Product Inquiries Orders support zaiput com sales zaiput com orders zaiput com Copyright Zaiput Flo...

Отзывы: