SCOPE OF DELIVERY
•
EQ1 stereo equalizer unit
in the 500 series format
•
this User Manual
•
(spare) countersunk screws (4 pcs.) for rack
mounting UNC 4-40 3/8, silver
•
knurled head screw with M3 thread
(tool for extracting the unit, see below)
•
(spare) countersunk screw for front panel M3,
black, see below
Warning:
Never insert a EQ1 unit while your rack is powered.
It may cause damage to the unit as well as the rack.
EQ1 must not be operated at ambient temperatures above 40°C and below 5°C.
As API series racks are equipped individually and the cabinets they are mounted in differ a lot in the way they are
ventilated, there is no rule other than keeping an eye on the temperature inside the rack while in operation.
Operating a unit beyond the limits can lead to severe damage.
In case you need to remove EQ1 from an API 500 series rack, you may use a gadget on the front panel: Remove the
M3 countersunk screw in the LO MID section. In place of this screw, screw in the enclosed knurled head screw with
M3 thread, gently without using any force. Then seize the tool and draw out the unit from the rack. Just draw on the
tool, do not apply any force to the sides! Do not forget to unscrew the bolt and remount the M3 countersunk screw.
SETTING-UP OPERATION
EQ1 is designed to be operated in a API 500 series rack or compatible, occupying two slots.
Switch off power and remove the mains
cable from your API 500 series rack
1.
Carefully insert EQ1 into two free slots, keeping
the unit well aligned until the card edge
connectors meet their counterparts
2.
Firmly push the unit in place
– do not use excessive force
3.
Fix the EQ1 front panel with 4 screws
supplied by your rack manufacturer
(in case they are not available you
may use our enclosed spare screws)
4.
Connect your audio I/Os to the rack
and re-install power
5.