www.ZAERLTD.com
PG 8
STEP 8: Locate and assemble the Supports (H7) to the front of the Boiler from previous step with Nuts (O5) and Screws
(K1). Locate Lanterns (G6) and secure them to the Carriage (from STEP 4) with Nuts(Q7). Attach the Cart (STEP 5) and
Carriage (STEP 4) to the assembled Bottom Part (STEP 3) with Nuts (P6).
215.766.2010
ZAER LTD. INTERNATIONAL
ASSEMBLY INSTRUCTIONS
ITEM NO.: ZR200777
H7
H7
G6
G6
G6
G6
G6
H7
Q7
P6
O5
K1
O5