14
RabbitCore 2000
3.1 Connections
1. Attach RabbitCore 2000 to Prototyping Board
Turn the RabbitCore 2000 so that the Rabbit 2000 microprocessor is facing as shown
below. Plug RabbitCore 2000 Headers J1 and J2 into the sockets of headers J1 and J3 on
the Prototyping Board.
Figure 1. Attaching RabbitCore 2000 to Prototyping Board
It is important that you line up the pins on the RabbitCore 2000 headers J1 and
J2 exactly with the corresponding pins of headers J1 and J3 on the Prototyping
Board. The header pins may become bent or damaged if the pin alignment is
offset, and the RabbitCore 2000 will not work.
J2
J1
+
C1
J4
U1
J5
S2
S3
S1
RN1
D2
JP1
DS3
DS2
DS1
C2
U2
C3
C4
C5
J6
C6
GND
VCC
VCC
PA
1
PA
3
PA
5
PA
7
PB1
PB3
PB5
PB7
GND
D6
GND
PA
0
PA
2
PA
4
PA
6
PB0
PB2
PB4
PB6
D7
PCLK
RCM2000 PROT
OTYPING BOARD
D4
D2
D0
PE6
PE4
PE2
PE0
/IOR
/WDO
A1
1
A9
A7
A5
A3
A1
S
TAT
PC1
PC3
PC5
PC7
PD1
PD3
PD5
PD7
VCC
VRAM
SM1
/RSTI
GND
A12
A10
A8
A6
A4
A2
A0
PC0
PC2
PC4
PC6
PD0
PD2
PD4
PD6
GND
VBA
T
SM0
VCC
D5
D3
D1
PE7
PE5
PE3
PE1
/RST
O
/BEN
/IOW
RESET
S2
PB3
PB2
PA1
PA0
DS3
S3
DS2
PWR
GND
RXB
TXB
TXC
RXC
GND
J3
RS-232
Prototyping
Board
Rabbit 2000
Core Module
C4
U1
U2
R4
Y2
C5
R3
Y1
C1
C2
R2
TP1
R1
JP1
C3
TP3
TP2
J3
PB5
PB7
GND
PB4
PB6
PCLK
D6
D7
D2
D3
D5
D4
D1
D0
PE7
PE6
PE5
PE4
PE3
PE2
PE1
PE0
/IOW
/IOR
/BEN
/WDO
PA1
PA3
PA5
PA7
PB1
PB3
GND
PA0
PA2
PA4
PA6
PB0
PB2
J1
VCC
J2
A12
A10
A8
A6
A4
A2
A0
A11
A9
A7
A5
A3
A1
STAT
PC0
PC2
PC4
PC6
PD0
PD2
PD4
PD6
GND
VBAT
PC1
PC3
PC5
PC7
PD1
PD3
PD5
PD7
VCC
SM1
GND
VRAM
SM0
VCC
/RESO
/RSTI
SRAM
Line up the
mounting holes
Содержание RabbitCore 2000
Страница 1: ...RabbitCore 2000 C Programmable Core Module Getting Started 001004 C...
Страница 4: ...RabbitCore 2000...
Страница 7: ...Getting Started 1 1 INSTALLING DYNAMIC C...
Страница 24: ...18 RabbitCore 2000...
Страница 25: ...Getting Started 19 4 SAMPLE PROGRAMS...
Страница 33: ...Getting Started SCHEMATICS...
Страница 34: ......