OP7100
84
s
Installation
Mounting
A bezel and a gasket are included with the OP7100. When properly mount-
ed in a panel, the bezel of the OP7100 is designed to meet NEMA 4 speci-
fications for water resistance.
Since the OP7100 employs an LCD display, the viewing angle must be
considered when mounting the display. Install the OP7100 at a height and
angle that makes it easy for the operator to see the screen.
Note that the contrast controls, both manual and software, act
as view-angle controls, and should be adjusted to provide
theoptimum display quality at the angle from which the display
will normally be viewed.
Bezel-Mount Installation
This section describes and illustrates how to bezel-mount the OP7100.
Follow these steps for bezel-mount installation.
1. Cut mounting holes in the mounting panel in accordance with the
recommended dimensions in Figure 6-2, then use the bezel faceplate to
mount the OP7100 onto the panel.
Figure 6-2. Recommended Cutout Dimensions
2. Remove all eight 4-40 locking hex nuts from their studs on the bezel,
and carefully drop in the OP7100 with the bezel and gasket attached.
4.600
(1
17)
7.000
(178)
3.500
(89)
5.380
(137)
0.180
(4.5)
1.620
(40)
0.125 D, 8x
(3)
1.100
(28)
CUTOUT
0.150
(3.8)
!
Содержание OP7100
Страница 1: ...OP7100 Serial Graphic Display User s Manual 019 0065 020418 J ...
Страница 10: ...OP7100 x s About This Manual ...
Страница 16: ...OP7100 16 s Overview ...
Страница 50: ...OP7100 50 s Hardware ...
Страница 51: ...OP7100 Software s 51 CHAPTER 4 SOFTWARE Chapter 4 describes the Dynamic C functions used with the OP7100 ...
Страница 72: ...OP7100 72 s Software ...
Страница 80: ...OP7100 80 s Graphics Programming ...
Страница 86: ...OP7100 86 s Installation ...
Страница 96: ...OP7100 96 s Specifications ...
Страница 110: ...110 s Serial Interface Board 2 OP7100 ...
Страница 111: ...OP7100 Backup Battery s 111 APPENDIX E BACKUP BATTERY ...
Страница 114: ...OP7100 114 s Backup Battery ...
Страница 122: ...OP7100 122 s Index ...