THE SPACE BETWEEN (MQ) LAG BOLTS MUST BE AT LEAST 16" APART.
2. Fold the Middle Flaps located on (22) Mounting Template Guide INWARD (AWAY from the wall) and remove
the Adhesive Covers.
3. With the Middle Flaps still folded inward, position (22) Mounting Template Guide as desired, using a Level to
make sure the Template is positioned properly.
4. Now press the Middle Flaps to the wall and mark your Lag Bolt Locations with a Pencil, making sure they are
at least 16" (Sixteen Inches) apart.
1. Make sure your Mounting Surface is free of dust and debris.
Содержание Merako ZL7227-58M29U
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 6: ...TOP TOP TOP...
Страница 7: ...TOP TO P...
Страница 8: ......
Страница 9: ......
Страница 10: ...F...
Страница 11: ......
Страница 12: ......
Страница 13: ...TOP TOP...
Страница 14: ......
Страница 15: ...NOTE Refer to the Hinge Adjustment Supplement next page for more information...
Страница 16: ...HINGE ADJUSTMENT SUPPLEMENT...
Страница 18: ......
Страница 22: ...MQ...
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 28: ...STEP 24B Rounded Inset or Obstructed Back TV...
Страница 29: ...ZL7227 58M29U Page 29 of 35...
Страница 32: ......
Страница 33: ...ZL7227 58M29U Page 33 of 35 USB HUB WIRE MANAGEMENT COVER INSTALLATION 23...
Страница 34: ......
Страница 35: ...Product size 58 W x 21 1 4 D x 57 H ZL7227 58M29U Page 35 of 35 65 Lbs...
Страница 36: ......
Страница 38: ......
Страница 39: ......
Страница 40: ...ZL7227 58M29U_V00_GV...