YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720
Page 20
DP-2010JF ver.05202005
SSSSS
ECTION
ECTION
ECTION
ECTION
ECTION
66666::::: P
P
P
P
P
R
RR
RROGRAMMING
OGRAMMING
OGRAMMING
OGRAMMING
OGRAMMING
FOR
FOR
FOR
FOR
FOR
P
P
P
P
P
R
RR
RROPOR
OPOR
OPOR
OPOR
OPORTION
TION
TION
TION
TIONAL
AL
AL
AL
AL
-----
TTTTTO
O
O
O
O
-----TTTTT
IME
IME
IME
IME
IME
O
O
O
O
O
PERA
PERA
PERA
PERA
PERATION
TION
TION
TION
TION
4. Turn mode switch 1 to on.
5. Turn mode switch 2 to on.
6. Turn mode switch 3 to on.
7. Turn mode switch 4 to off.
8. Press the test button once to initiate the
timer sequence.
3. Adjust the pump volume adjustment knob to
the value used in the calculations in step 1.
Number of turns open on the pump volume knob
3
6
12
Sample pump displacement per stroke
.1cc
.2cc
.4cc
System
Mutual
Approved
Factory
figure 12
figure 13
Содержание DynaPak DP-2010JF
Страница 1: ...DynaPak GasSampler S Y S T E M S U P P O R T M A N U A L DP 2010JF...
Страница 2: ......
Страница 3: ...DP 2010JF INSTRUCTION OPERATING MANUAL Version 05202005...
Страница 4: ......
Страница 63: ......