
DP-2010J Version 04232001 Rev-ATEX
YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720
13
9.3 Adjust the pump volume adjustment knob to
the value used in the calculations in step 9.1.
9.4 Turn mode switch 1 to on.
9.5 Turn mode switch 2 to on.
9.6 Turn mode switch 3 to off.
9.7 Turn mode switch 4 to off.
9.8 Press the test button once to initiate the timer
sequence.
NOTE: For the Z-65 to operate the DP-2010
System, a minimum pressure differential of 3" of
water must exist between the high pressure and
low pressure ports of the DPS-2.
Number of turns open on the pump volume knob
3
6
12
Sample pump displacement per stroke
.1cc
.2cc
.4cc
System
Mutual
Approved
Factory
9. Sampler set-up
time-based sampling with the DPS-2
Содержание DynaPak 2010J
Страница 1: ...DynaPak2010J SystemSupport Manual DP 2010J Version 04232001 Rev ATEX...
Страница 24: ...24 Diagram 1 DP 2000 pump assembled...
Страница 26: ...26 Diagram 3 YZ filter regulator assembled...
Страница 34: ...34 Notes...