
DP-2010J Version 04232001 Rev-ATEX
YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720
11
8.4 Turn mode switch 1 to on.
8.5 Turn mode switch 2 to on.
8.6 Turn mode switch 3 to on.
8.7 Turn mode switch 4 to off.
8.8 Press the test button once to initiate the timer
sequence.
8.3 Adjust the pump volume adjustment knob to
the value used in the calculations in step 8.1.
Number of turns open on the pump volume knob
3
6
12
Sample pump displacement per stroke
.1cc
.2cc
.4cc
System
Mutual
Approved
Factory
8. Sampler Set-Up
Time-based sampling
Содержание DynaPak 2010J
Страница 1: ...DynaPak2010J SystemSupport Manual DP 2010J Version 04232001 Rev ATEX...
Страница 24: ...24 Diagram 1 DP 2000 pump assembled...
Страница 26: ...26 Diagram 3 YZ filter regulator assembled...
Страница 34: ...34 Notes...