background image

Wegj Install - Mar2007

Page 3 of 4

FIG.C: WEGJ HEATER DIMENSIONS AND WATER BOOSTER POSITIONS 

(not to scale)

Ash Floor Protector

300

750

225

535

600

760

Right Hand std. water booster position

Left Hand std. water booster position

130

393

471

FIG.D: HEATER POSITION 

(not to scale)

  

950 Min

25 mm AIR GAP

300

100

585

50

885

                             

A

F

B

G

O

J

D

D

C

N

K

    

J

P

C

D

D

O

K

 

      

C

N

H

M

L

E

E

D

D

H

Above: Non combustible wall clearances

. Brick lining

from floor to within 25mm of ceiling. Leave air vents at the

bottom to allow airflow in the cavity.   If Yunca flue mounted

shield is fitted, brickwork may be 1200mm high as long as

all vertical joints in top and bottom of brickwork are left out to

allow airflow when brickwork is capped.

FIG D: MINIMUM FIRE TO COMBUSTABLE WALL CLEARANCES - WEGJ

(WITH YUNCA FLUE MOUNTED SHIELD FITTED). Measurements in millimetres.

A

B

E

F

G

H

100

200

30

325

575

454

FIG D: MINIMUM FLOOR PROTECTION MEASUREMENTS

(WITH YUNCA FLUE MOUNTED SHIELD FITTED). Measurements in millimetres.

C

D

J

K

L

M

N

O

P

300

100

950

935

1247

1147

610

750

635

Отзывы: