IMPORTANT INFORMATION
I.
It is imperative that you familiarise yourself with this entire document, and
also ensure you have sufficient knowledge of relevant building regulations
prior to proceeding with an installation.
II.
The appliance and flue system shall be installed in compliance with AS/NZS
2918:2001 and the appropriate requirements of the relevant building code or
codes.
III.
Appliances installed in accordance with this standard shall comply with the
requirements of AS/NZS 4013 where required by the regulatory authority i.e.
the appliance shall be identifiable by a compliance plate with the marking
“tested to AS/NZS 4013”.
IV.
Any modification of the appliance that has not been approved in writing by
the testing authority is considered to be in breach of the approval granted for
compliance with AS/NZS 4013.
V.
Mixing of appliance or flue system components from different sources, or
modifying the dimensional specification of components may result in
hazardous conditions. Where such action is considered, the manufacturer
should be consulted in the first instance.
VI.
Cracked and broken components e.g. glass panels or insulation panels, may
render the installation unsafe.
INSTALLATION:
A. Competent Trades Persons
are recommended to carry out all installations (e.g. a
NZHHA Registered Installer), to obtain maximum performance and safe, efficient heating.
B. A Consent
is required and we suggest you check with Local Authority Building
Inspectors as by-laws do vary from area to area.
Also notify your Insurance Company that a solid fuel heater has been installed.
C. Floor Protector:
– Projection of required floor protector may be read off the graph
and/or table on the next page: