125
18. MAINTENANCE
18.1 GUIDES TO MAINTENANCE
M
AINTENANCE OPERATIONS
•
Do not carry out any inspection or maintenance
operation that is not given in this manual.
•
Perform maintenance in hard, flat ground.
Check hour meter:
Every day check the hour meter, to see if the time has come out for any
necessary maintenance to be carried out. Carry out all operations with
method and schedule written in this manual. The maintenance carried out
following the instruction given in this manual will prolong the machine life and
performance, reducing problem and operating costs.
Missed respect of the instructions and scheduled operation, also
maintenance performed by inexperienced or not allowed operators, will
lapse the guarantee.
Warning plate:
Put the warning plate on the start key or on some lever where you are sure
that it will be seen, so to avoid that other operator who, do not know you are
performing maintenance, start the machine.
NON
DO NOT OPERATE
MACHINE
UNDER SERVICE
Date
Sign
Содержание YC135
Страница 2: ......
Страница 4: ...4...
Страница 14: ...14...
Страница 40: ...40...
Страница 51: ...51 5 2 1 Transport blocked All dimensions are in mm they may change without notice...
Страница 95: ...95...
Страница 100: ...100...
Страница 108: ...108...
Страница 110: ...110...
Страница 118: ...118...
Страница 120: ...120...
Страница 124: ...124...
Страница 169: ...169 20 HYDRAULIC SCHEME...
Страница 171: ...171 21 ELECTRICAL SCHEME...
Страница 179: ...179 24 NOTICE...
Страница 180: ...180...