YSI Pro 1020 Скачать руководство пользователя страница 5

IOP 019B.0 

Effective Date: 1/26/2017 

Page 5 of 8 

 

At least one of the calibration points must be done with pH 7 buffer.  For auto buffer 

recognition to work properly with an older or dirty sensor, calibrate in pH 7 buffer first. 

For highest accuracy, use fresh, traceable pH buffers and ensure the sensor and 

calibration cup are clean.  Most applications in the SLCP use a two point calibration: 

1.  

Place the sensor in pH 7 buffer and allow the temperature and pH readings to 

stabilize for at least 5 minutes. 

2.  

Press and hold Cal for three seconds. 

3.  

Highlight pH and press enter. If pH is not listed as an option, check the System 

Setup menu to ensure pH is enabled in the ISE Sensor Type menu. 

4.  

Highlight 2 point and press enter. 

5.  

If necessary, use the up and down arrow keys to adjust the pH buffer value. Note 

the pH mV reading which ideally should be between -50 and +50 in pH 7 buffer.  

If the pH mV reading is outside of this range, clean the sensor as described in 

the maintenance section of this protocol. 

6.  

Press enter to continue to second point. 

7.  

Rinse the sensor and place it in the second pH buffer (4 for alkalinity 

measurements or 10 for stream pH measurements). 

8.  

If necessary, use the up and down arrow keys to adjust the pH buffer value. 

9.  

Wait at least 5 minutes for the pH sensor to stabilize and for the temperature 

reading to stabilize. Note the pH mV reading. pH mVs in buffer 4 should be 

+159 to 180 mV from the previous buffer 7 pH mV value. pH mVs in buffer 10 

should be -159 to 180 mV from the previous buffer 7 pH mV value.  If the mV 

readings are outside of these ranges, clean the sensor as described in the 

maintenance section of this protocol. 

10.  

Press enter to complete the calibration or press Cal to cancel. 

11.  

‘Calibration Successful’ will display for a few seconds to indicate a successful 

calibration and then the instrument will return to the Run screen. 

12.  

If the calibration is unsuccessful, an error message will display on the screen. 

Press the Cal key to exit the calibration error message and return to the Run 

screen. See the Troubleshooting section of this manual for possible solutions. 

C. 

DO sensor calibration 

1.

 

The supplied sensor storage container (a clear sleeve) can be used for DO 

calibration purposes. Moisten the sponge in the storage sleeve or plastic cup 

with a small amount of clean water. The sponge should be clean since bacterial 

growth may consume oxygen and interfere with the calibration. If using the cup 

and you no longer have the sponge, place a small amount of clean water (1/8 

inch) in the sleeve instead.  Make sure there are no water droplets on the DO 

membrane or temperature sensor. Then install the storage sleeve over the 

sensors, but do not screw on completely.  Leaving 2-3 threads disengaged 

ensures venting to the atmosphere.  Make sure that DO and temperature sensors 

are not immersed in water. 

2.

 

Turn the instrument on and wait 15 minutes for the storage container to become 

Содержание Pro 1020

Страница 1: ...bes pH 605101 DO 605203 MANUFACTURER Yellow Springs Instrument Co Inc YSI PRECAUTIONS POTENTIAL INTERFERENCES General Greatest accuracy is achieved if the actual samples to be measured are within 10 C of the calibration solutions Longer cable lengths introduce more error into the readings Dissolved oxygen Chlorine sulfur dioxide nitric oxide and nitrous oxide can affect readings by behaving like o...

Страница 2: ...nsor and two sensor ports 3 Sensors two sensors are required to measure all of the water chemistry parameters indicated above Sensors are installed in the cable bulkhead ports indicated below to ensure proper function If measurement of one of the parameters is not required the corresponding sensor s may be removed and replaced with a sensor port plug a temperature sensor is permanently incorporate...

Страница 3: ...ess the Power key to turn the instrument on The instrument will briefly display the splash screen with the YSI logo then go directly to the main run screen 2 Setup Sensors a Press Menu button b Dissolved oxygen sensor 1 Highlight DO Sensor Type Press enter 2 Highlight Polaro black and press enter to confirm 3 Highlight ESC exit press enter 4 Highlight DO Membrane type press enter 5 Highlight 1 25 ...

Страница 4: ...lt in damage e Twist the sensor clockwise to engage threads and finger tighten Do not use a tool This connection is waterproof Refer to the sensor installation sheet included with each sensor for detailed instructions 5 Install the 2003 DO sensor membrane as follows a Change membrane and oxygen probe electrolyte solution every 30 days b Remove the metal sensor guard 3 If installing a membrane for ...

Страница 5: ...reading pH mVs in buffer 4 should be 159 to 180 mV from the previous buffer 7 pH mV value pH mVs in buffer 10 should be 159 to 180 mV from the previous buffer 7 pH mV value If the mV readings are outside of these ranges clean the sensor as described in the maintenance section of this protocol 10 Press enter to complete the calibration or press Cal to cancel 11 Calibration Successful will display f...

Страница 6: ...nd across the DO sensor membrane to obtain an accurate reading Be careful not to create a vortex which allows air bubbles to pass against the DO membrane G After at least 5 minutes and once the values stabilize record the measurement IIX Sensor storage A Short term storage The cable assembly is supplied with a sensor storage container or sleeve that attaches to the cable The container is used for ...

Страница 7: ... 15 minutes in clean water Not DI water Soaking in DI water will shorten the life span of the probe containing a few drops of commercial dish washing liquid Gently clean the glass bulb and platinum button by rubbing with a cotton swab soaked in the cleaning solution Rinse the sensor in clean water wipe with a cotton swab saturated with clean water and then re rinse with clean water II Additional c...

Страница 8: ...Jessica M Barber Digitally signed by JESSICA BARBER Date 2020 03 10 11 25 00 04 00 ...

Отзывы: